keywords Lay-out Planning, Priority Policy, Dynamic Programming, Simulation 
abstract Though numerous studies have dealt the lay-out planning methods for shipbuilding industry, in practice the lay-out planning is still done by people under the rule of thumb. It seems illogical to treat such key resource without any scientific management, however matters such as reliability, frequent modifications, and lack of data makes it hard to adapt an automated method in such spatial planning.
To investigate on this problem this paper examines a heavy industry company in Korea and executes a simulation study. The targeted company produces numerous types of offshore plants which all follows varying production processes. So it is told that there exists some special difficulties in predicting and managing newly given constructions. Also another characteristic that makes managing such work difficult is that there exists frequent change requests to design process, quantity, and schedule.
Like many other competitive companies, company H still relies solely on human resource to plan the lay-outs without using any automated systems. This could cause problems such as long hours spent in planning/evaluating the lay-out plan and the difficulty in attaining a substitute for such planning jobs. This is because the current lay-out planning process depends heavily on the experiences of the planner. The difficulty of training a worker to become such specialist is one thing, but to find a substitute in the case of emergency is a more serious problem.
To solve this problem this paper suggests a practical algorithm that can deploy the blocks under a short given time. The system would automatically prioritize the blocks that needs to be placed on the yards and find a location that could maximize the yard utilization and minimize the delays on the site. However because of the uncertainties in the field, such as assembly modifications, contract date delays, and variations in the processing time, it is extremely difficult to find an optimal solution in such short given time.
Studies done by Li(2005) have divided the lay-out process into two separate steps, prescheduling and spatial planning. Here the second step utilized the genetic algorithm. Other researches such as Raj(2007) treated this problem as a 3D bin packing problem, while Zheng(2011) approached this matter using greedy algorithm to minimize the makespan. However none of the previous works considered the uncertainties that exits on the spatial planning process.
So to aid the suggested problem this simulation study aims to find a priority rule to deploy the blocks while considering the uncertainties. Measures such as block size, delayed time of the selected block, and so on would be examined through simulation to find the best performing weights for such variables. Blocks will be prioritized under this rule and will be placed on the yards using the suggested algorithm.
A typical process of such simulation would go through following steps. The first step would be deciding the timeline of deployment. After selecting the timeline target project will be selected. The term project used here is a group of modules and blocks that needs to be placed on the yard. The next step would be choosing the weights for the priority rule. Measures such as delayed time, deployment time, and the size of the block would be considered. By simulating the model while varying the weights of such measures, we will be able to suggest the best performing block selecting policy rule for the spatial lay-out planning. 
번호 category 학회 제목 author presenter year
15 IC  KGW  A study on due-date assignment method in wafer fabrication facility producing multiple product types file Jaewon Park    2005 
14 IC  MITIP  Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard Jinwu Seo    2011 
13 IC  PAIS  Knowledge Acquisition using Neural Network and Simulator Kitae Shin    2001 
12 IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
11 IC  PCM  FMS Scheduling Strategies in a Distributed Coordination Environment Jonghun Park    1996 
10 IC  PEDAC  A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness Daeyoung Chung    2001 
9 IC  PLM  Designing Product Platform for Efficient Production Planning Process Hongbum Na    2008 
8 IC  SCSC  Performance Improvement Methodology for a Manufacturing System using Petri Nets and Simulation Analysis Kichang Lee    2002 
7 IC  SCSC  Inventory Management in a Supply Chain using Neural Networks file Sungwon Jung    2002 
6 IC  SCSC  Performance Evaluation of Alternative Designs for the Car Recycling System Using Simulation Analysis file Eoksu Sim    2004 
5 IC  SeoulSim  Design for a Hybrid System of Integration Kanban with MRPII Taeyoung Song    2001 
4 IC  SICEAS  INTERACTIVE PLACEMENT METHOD FOR CONTAINER LOADING PROBLEM USING DEPTH CAMERA file Nasution Ninan  Nasution Ninan  2017 
3 IC  SISE  Inventory Management System using 3D-Camera & Deep Learning file Chanho Hwang  Chanho Hwang  2016 
2 IC  SISE  Impact of Information Visibility of Quality and Physical Flow on the Closed-loop Supply Chain file Young-woo Kim  Young-woo Kim  2016 
1 IC  W-PIN  ISP vs. ISP+CDN: Can ISPs in Duopoly Profit by Introducing CDN Services? Dongmyung Lee    2012