75 | IC | ISCM |
Integrated Models for Multi-level Planning and Scheduling in Supply Chain
| Haejoong Kim | | 2006 |
74 | IC | INFORMS-KORMS |
Hybrid Algorithms in Integrated Quality Design & Scheduling
| Jonghan Kim | | 2000 |
73 | IC | INFORMS-KORMS |
Development of capacitated event-driven MRP components using object oriented method
| Seunghyun Yoon | | 2000 |
72 | IC | INFORMS |
A Study on emergency logistics problem after massive natural disaster
| Sumin Han | Sumin Han | 2014 |
71 | IC | IJIE |
DEVELOPING GOOD QUALITY PERFORMANCE MEASURMENT MODEL TOWARD SMART FACTORY
| Gyusun Hwang | Gyusun Hwang | 2016 |
70 | IC | IIE |
Development of a Grid-Enabled MRP Process in RFID-Based APS
| Hyoung-Gon Lee | | 2007 |
69 | IC | IFORS |
A Closed-loop Supply Chain Coordination Model Considering the Effect of Regulation Alternatives
| Youngwoo Kim | | 2011 |
68 | IC | IFAC on IMS |
A Weighted Load Balancing Heuristic that Minimizes Makespan in Alternative Routing and Machine Environment
| Kidong Kim | | 1997 |
67 | IC | IEOM |
A Real-time Information System Using RFID for Visually Impaired
| Kyounghwi Tae | | 2011 |
66 | IC | IEOM |
Designing an effective scheduling scheme considering multi-level BOM in hybrid job shop
| Sumin Han | | 2012 |
65 | IC | IEOM |
Relieving electric power dependency during shortage with an on-site solar power supply
| CHOE SANG YUN | CHOE SANG YUN | 2015 |
64 | IC | ICUT |
A Framework for the Measurement of Supply Chain Performance in Ubiquitous Sensor Network
| Jaehyun Kong | | 2007 |
63 | IC | ICRA |
An On-Line Production Scheduler using Neural Network and Simulator based on Manufacturing System State
| Kitae Kim | | 2001 |
62 | IC | ICQT |
A Token Pricing Scheme for Internet Services
| Dongmyung Lee | | 2011 |
61 | IC | ICPR |
Business Process Modeling for developing a performance measurement system using the Internet of Things
| Gyusun Hwang | Jinwoo Park | 2015 |
60 | IC | ICPR |
A Study on FMS Scheduling Problems Based on Priority Functions Generated by Genetic Programming
| ChangUk Kim | | 1997 |
59 | IC | ICPR |
A Scheduling Algorithm considering Subcontract cost in MRP Environment
| Kichang Lee | | 1997 |
58 | IC | ICPR |
An Algrorithm for Job Shop Scheduling Problem with Due Date Constraints Considering Operation Subcontract
| Daeyoung Chung | | 2000 |
57 | IC | ICPR |
Development of a Decision Support System for the formulation of Manufacturing
| Kichang Lee | | 2001 |
56 | IC | ICPR |
Combined production and distribution planning using demand based mixed Genetic Algorithm in a supply chain
| Sungwon Jung | | 2003 |