author CHOE SANG YUN 
2nd author Jinwoo Park 
presenter CHOE SANG YUN 
info This conference paper has been presented by CHOE SANG YUN on the Asia-Pacific Conference on Industrial Engineering and Management System. The conference has been held in Jeju, Korea, Republic of, 2014/10/12 ~ 2014/10/15 . 
year 2014 
category IC 
start / end date  
city / nation  
학회 APIEMS 
keywords solar power supply, new renewable energy, photovoltaic, solar energy 
abstract All over the world, only a fraction of potential solar energy is used in generating electricity. Especially in Korea, we use very little of solar powers in spite of the fact we have annual electricity shortage crisis during the summer or winter in accordance with the peak electricity demand. In this situation, photovoltaic electric power generation at the site of demand can be a good candidate solution. This study estimates the potential of solving the power shortages by calculating maximum and minimum of solar energy generation near the demand site through simulation studies.
Because the solar power generation technology is strongly influenced by external factors, we consider external factors such as solar irradiation on a tilted module surface, possible installation area, temperature, etc. and estimate the maximum and minimum of power output in a dynamic situation. This study could be a good policy guide for expanding the solar power supply. 

Download :

번호 category 학회 제목 author presenter year
95 IC  EURO  Multiperiod Hybrid Manufacturing/Remanufacturing Planning Under the Internet-of-Things Scenario file Young-woo Kim  Young-woo Kim  2015 
94 IC  SISE  Impact of Information Visibility of Quality and Physical Flow on the Closed-loop Supply Chain file Young-woo Kim  Young-woo Kim  2016 
93 IC  APORS  A study on makeshift recovery planning in emergency logistics considering disaster scene's risks and uncertainties file Sumin Han  Sumin Han  2015 
92 IC  FAIM 2016  A Study on the Distributed Vehicle Routing Problem of emergency vehicle fleet in the Disaster Scene file Sumin Han  Sumin Han  2016 
91 IC  INFORMS  A Study on emergency logistics problem after massive natural disaster Sumin Han  Sumin Han  2014 
90 IC  ICPR  On-Site Safety Education in Factories Using Augmented Reality with Text Mining-based Marker file Philjun Moon  Philjun Moon  2017 
89 IC  SICEAS  INTERACTIVE PLACEMENT METHOD FOR CONTAINER LOADING PROBLEM USING DEPTH CAMERA file Nasution Ninan  Nasution Ninan  2017 
88 IC  ICAT  A study on RFID user memory applications for production management and scheduling file Kyoungmin Kim  Kyoungmin Kim  2015 
87 IC  AsiaSim  A Study on Simulation Model for Yard Layout Planning in Offshore Plant Industry file Kim Hyun Jun  Kim Hyun Jun  2015 
86 IC  ICPR  Business Process Modeling for developing a performance measurement system using the Internet of Things file Gyusun Hwang  Jinwoo Park  2015 
85 IC  APMS  Korea Smart Factory Program - Keynote Jinwoo Park  Jinwoo Park  2015 
84 IC  IJIE  DEVELOPING GOOD QUALITY PERFORMANCE MEASURMENT MODEL TOWARD SMART FACTORY Gyusun Hwang  Gyusun Hwang  2016 
83 IC  ICDMCE  Study on smart disaster recovery system using Internet of Things file Sumin Han  Gyusun Hwang  2016 
» IC  APIEMS  A study on relieving electric power shortage by on-site solar power supply CHOE SANG YUN  CHOE SANG YUN  2014 
81 IC  IEOM  Relieving electric power dependency during shortage with an on-site solar power supply CHOE SANG YUN  CHOE SANG YUN  2015 
80 IC  SISE  Inventory Management System using 3D-Camera & Deep Learning file Chanho Hwang  Chanho Hwang  2016 
79 IC  ICIMSA  Internet of Things-Enabled Supply Chain Performance Measurement Model file Abdallah J. Dweekat  Abdallah J. Dweekat  2016 
78 IC  CIE  A batch splitting heuristic for dynamic job shop scheduling problem Hanil Jeong    1996 
77 IC  CIE  A decision support model for the initial design of FMS Hosub Shin    1996 
76 IC  ICARCV  A Discrete Control Approach to Robotic Cell Operating System Design Jonghun Park    1996