author Tai-Woo Chang 
2nd author / Hanil Jeong (Dept. of Industrial Engineering, Seoul National University)
/ Chankwon Park (Dept. of Industrial Engineering, Seoul National University)
/ Yunseok Nam ()
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 2004년 03월 25일 ~ 2004년 03월 27일
City: Jeju
Nation: Korea
Additional Information:
33rd ICC&IE (International Conference on Computers and Industrial Engineering) 
year 2004 
category IC 
start / end date  
city / nation  
학회 CIE 
keywords postal address database, information strategy planning, to-be model design 
abstract In this paper, we provide a plan of construction, employment and management of the Korean postal address database and discuss the design of to-be models about it. For the purpose we adopt and modify the information strategy planning methodology to fit it into our study. We examine the managerial environments and limitations of the postal services in Korea; we lead the critical success factors and define the requirements in result. The U.S. Postal Service (USPS) was chosen as the best practice for a benchmarking with its advanced management of the address databases. After analyzing the current status of the postal business processes and information systems used, we classify the products and the services of USPS by the process to which they are applied and propose a deployment plan. In order to design to-be models, we define the operational and managerial functions for the address database and specify the scenario according to the functions. By managing the address database and supporting the postal services, it could be possible to make the business competitive and satisfy the customer demands. 
번호 category 학회 제목 author presenter year
75 IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
74 IC  PCM  FMS Scheduling Strategies in a Distributed Coordination Environment Jonghun Park    1996 
73 IC  ICPR  A Study on FMS Scheduling Problems Based on Priority Functions Generated by Genetic Programming ChangUk Kim    1997 
72 IC  ICPR  A Scheduling Algorithm considering Subcontract cost in MRP Environment Kichang Lee    1997 
71 IC  IFAC on IMS  A Weighted Load Balancing Heuristic that Minimizes Makespan in Alternative Routing and Machine Environment Kidong Kim    1997 
70 IC  APIEMS  An Integrated Approach for Loading and Scheduling of a Flexible Manufactureing System Sangbok Woo    1999 
69 IC  APIEMS  A Study on Developing a Scheduling System in Alternative Routing and Machine Environment Kidong Kim    1999 
68 IC  IW on IMS  Maximally permissive adaptive control of an automated manufacturing cell Sangkyun Kim    1999 
67 IC  ICPR  An Algrorithm for Job Shop Scheduling Problem with Due Date Constraints Considering Operation Subcontract Daeyoung Chung    2000 
66 IC  INFORMS-KORMS  Hybrid Algorithms in Integrated Quality Design & Scheduling Jonghan Kim    2000 
65 IC  INFORMS-KORMS  Development of capacitated event-driven MRP components using object oriented method Seunghyun Yoon    2000 
64 IC  PAIS  Knowledge Acquisition using Neural Network and Simulator Kitae Shin    2001 
63 IC  SeoulSim  Design for a Hybrid System of Integration Kanban with MRPII Taeyoung Song    2001 
62 IC  GECCO  A Study on the Resource Allocation Planning for Automated Container Terminals Yangja Jang    2001 
61 IC  ICPR  Development of a Decision Support System for the formulation of Manufacturing Kichang Lee    2001 
60 IC  ICRA  An On-Line Production Scheduler using Neural Network and Simulator based on Manufacturing System State file Kitae Kim    2001 
59 IC  PEDAC  A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness Daeyoung Chung    2001 
58 IC  ICMA  Machine-Understandable e-Business Modeling with Ontology Tai-Woo Chang    2002 
57 IC  Asian eBiz  A Systematic Approach for Ontology-based e-Business Modeling Tai-Woo Chang    2002 
56 IC  SCSC  Performance Improvement Methodology for a Manufacturing System using Petri Nets and Simulation Analysis Kichang Lee    2002