2015.07.31 14:36
| author | Hongbum Na |
|---|---|
| 2nd author | |
| presenter | |
| info | This conference paper has been presented by Hongbum Na on the International Conference on Production Research. The conference has been held in Stuttgart, Germany, 2011/7/31 ~ 2011/8/4 . |
| year | 2011 |
| category | IC |
| start / end date | |
| city / nation | |
| 학회 | ICPR |
| keywords | FMC scheduling, pallet constraints, transient disturbance, rescheduling method |
| abstract | When trying to solve a flexible manufacturing cell (FMC) scheduling problem in certain types of industrial situation, not only the routing and sequencing problems but also the availability of pallets and loading/unloading (L/U) stations could be considered. In those situations, scheduling problems are constrained by the number of pallets, pallet operation policies and L/U station conditions because each job requires a setup with different types of pallets, which are performed at L/U stations. In this study, overall scheduling process and several heuristic algorithms based on priority rules which utilize the information of pallets and L/U stations are introduced to generate good production schedules. The makespans of the machining centers and L/U stations are considered in a hierarchical manner. Considering practical shop environments, several types of transient disturbances such as preventive maintenance and machine breakdown are considered and several rescheduling methods are suggested |
Download :