15 | IC | PEDAC |
A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness
| Daeyoung Chung | | 2001 |
14 | IC | ICPR |
An Algrorithm for Job Shop Scheduling Problem with Due Date Constraints Considering Operation Subcontract
| Daeyoung Chung | | 2000 |
13 | IC | INFORMS-KORMS |
Hybrid Algorithms in Integrated Quality Design & Scheduling
| Jonghan Kim | | 2000 |
12 | IC | INFORMS-KORMS |
Development of capacitated event-driven MRP components using object oriented method
| Seunghyun Yoon | | 2000 |
11 | IC | APIEMS |
An Integrated Approach for Loading and Scheduling of a Flexible Manufactureing System
| Sangbok Woo | | 1999 |
10 | IC | APIEMS |
A Study on Developing a Scheduling System in Alternative Routing and Machine Environment
| Kidong Kim | | 1999 |
» | IC | IW on IMS |
Maximally permissive adaptive control of an automated manufacturing cell
| Sangkyun Kim | | 1999 |
8 | IC | ICPR |
A Study on FMS Scheduling Problems Based on Priority Functions Generated by Genetic Programming
| ChangUk Kim | | 1997 |
7 | IC | ICPR |
A Scheduling Algorithm considering Subcontract cost in MRP Environment
| Kichang Lee | | 1997 |
6 | IC | IFAC on IMS |
A Weighted Load Balancing Heuristic that Minimizes Makespan in Alternative Routing and Machine Environment
| Kidong Kim | | 1997 |
5 | IC | CIE |
A batch splitting heuristic for dynamic job shop scheduling problem
| Hanil Jeong | | 1996 |
4 | IC | CIE |
A decision support model for the initial design of FMS
| Hosub Shin | | 1996 |
3 | IC | ICARCV |
A Discrete Control Approach to Robotic Cell Operating System Design
| Jonghun Park | | 1996 |
2 | IC | PCM |
An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment
| Hanil Jeong | | 1996 |
1 | IC | PCM |
FMS Scheduling Strategies in a Distributed Coordination Environment
| Jonghun Park | | 1996 |