author Gyusun Hwang 
2nd author  
presenter  
info This conference paper has been presented by Gyusun Hwang on the 한국시뮬레이션학회 춘계학술대회. The conference has been held in 서울, 대한민국, 2013/5/31 ~ 2013/5/31 .

Additional information about the conference(conference paper) is '한국항공대학교'. 
year 2013 
category DC 
start / end date  
city / nation  
학회 시뮬레이션春 
keywords nyLogic, Health Inspection Center, Patient Flow 
abstract This study aims to find out the status of the checkup services in general hospital and improve them through simulation method. In general, medical checkup center tends to be crowded when the deadline nears and also in May which has many family days. As a result, waiting time for inspecting in certain period increases and customer’s complaint also increases. It also causes the overtime work of hospital employees causing additional expenses. The purpose of this study is to find out the bottleneck process regarding the scenario and optimize the checkup service by changing the inspection process. For this we analyzed the inspection data and variety of input resources. And we also measured the average processing time for each inspection process. By this, we developed an inspection process flow chart and deduce the expected inspection time and optimized resource utilization depending on the scenario. The simulation software used in this study is AnyLogic University 6.9.0. 

Download :

번호 category 학회 제목 author presenter year
134 DC  공동학회春  Development of a Shop-floor Scheduling and Control Software Based on Bidding Algorithm Daeyoung Chung    1995 
133 DC  공동학회春  Design and Specification of Low-Level Control Softwares for FMC using Supervisory Control Theory Sangkyun Kim    1995 
132 DC  시뮬레이션春  Simulation modeling of JIT System Kitae Kim    1995 
131 DC  공동학회秋  A Study on Modeling and Control of an FMC using Finitely Recursive Process Jaeheuk Choi    1995 
130 DC  산업공학秋  일정계획의 수행도를 고려한 공정 경로와 가공 기계 선정에 관한 연구 Kidong Kim    1996 
129 DC  공동학회春  An Approximation Method for Job Shop Scheduling Problem with Sequence Independent Setup Time Hanil Jeong    1996 
128 DC  공동학회春  A Study on Part Selection Problem at Initial Design Stage of FMS Hosub Shin    1996 
127 DC  공동학회春  Function-to-Process Flow Model Transformation for Design of CIM Chankwon Park    1996 
126 DC  전문가시스템秋  사례기반 추론에서 Fuzzy 개념을 이용한 유사사례 추출 Jonghan Kim    1996 
125 DC  공동학회春  철강산업에서 용선제조비용 최소화를 위한 최적화모형 개발 Jonghan Kim    1997 
124 DC  공동학회春  A scheduling algorithm considering subcontract cost in MRP environment Kichang Lee    1997 
123 DC  시뮬레이션春  FMS 스케줄링을 위한 Priority 함수의 자동 생성에 관한 연구 Kitae Kim    1997 
122 DC  시뮬레이션秋  금형 생산 시스템의 일정 계획 시스템 개발에 관한 연구 Daeyoung Chung    1997 
121 DC  경영과학秋  군집합 방법을 이용한 모듈라 자재명세서 생성 Jonghan Kim    1997 
120 DC  공동학회春  생산시스템의 지식획득을 위한 Intelligent Simulator설계에 관한 연구 Kitae Kim    1998 
119 DC  공동학회春  Multiple Views를 지원하는 통합 BOM관리 시스템의 구조 설계 Keumseok Kang    1998 
118 DC  시뮬레이션春  시뮬레이션을 이용한 기관차 용선수송작업 능률 향상방안에 관한 연구 Jonghan Kim    1998 
117 DC  산업공학秋  부품상태기반 시뮬레이터와 상태기반일정계획에 관한 연구 Kitae Kim    1998 
116 DC  산업공학秋  외주를 고려한 납기제약 일정계획 문제에 관한 연구 Daeyoung Chung    1998 
115 DC  산업공학秋  부품상태기반 일정계획 시뮬레이터의 개발에 관한 연구 Kitae Kim    1998