author 최상윤 
2nd author  
presenter  
info This conference paper has been presented by CHOE SANG YUN on the 한국시뮬레이션학회 춘계학술대회. The conference has been held in 대구, 한국, 2014/5/30 ~ 2014/5/30 . 
year 2014 
category DC 
start / end date  
city / nation  
학회 시뮬레이션春 
keywords solar power supply, new renewable energy, photovoltaic, Solar energy 
abstract Annually during the summer or winter, according to the peak power, power shortages have occurred repeatedly . In this situation, solar power supply can be considered as one of solutions. This study estimates the potential of possibility of solving the power shortages by calculating maximum and minimum of photovoltaic power generation through simulation studies.
Because new renewable energy such as solar power technology depends on external factors such as sunshine, the difference in power generation is huge. In this study, we set the external factors to the variable such as sunshine, the installation area, temperature and estimate the maximum and minimum values of electricity production through a variety of scenarios in a dynamic situation. As a result, this study will help to spread the solar power supply. 

Download :

번호 category 학회 제목 author presenter year
75 IC  GECCO  Solving Multi-level Lot Sizing Problem with Memetic Algorithm based on Refinement Procedure file Haejoong Kim    2006 
74 IC  ISCM  Integrated Models for Multi-level Planning and Scheduling in Supply Chain Haejoong Kim    2006 
73 IC  AsiaSim  A Model and Analysis of the Bullwhip Effect Using a SCOR-based Framework Haejoong Kim    2007 
72 IC  CIE  A batch splitting heuristic for dynamic job shop scheduling problem Hanil Jeong    1996 
71 IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
70 IC  APMS  Supply Chain Planning in Open Business Environment based on Business Patterns Hanil Jeong    2010 
69 IC  APMS  A new Approach for finite Capacity Planning in MRP Environment Hongbum Na    2006``` 
68 IC  PLM  Designing Product Platform for Efficient Production Planning Process Hongbum Na    2008 
67 IC  ICPR  A New Scheduling Paradigm Based on Farsighted Indices Hongbum Na    2009 
66 IC  ICPR  A study on scheduling and rescheduling problem of the FMC during transient disturbance period with pallet constraints Hongbum Na    2011 
65 IC  CIE  A decision support model for the initial design of FMS Hosub Shin    1996 
64 IC  IIE  Development of a Grid-Enabled MRP Process in RFID-Based APS Hyoung-Gon Lee    2007 
63 IC  ICPR  A High Performance MRP Part Explosion Process using Computational Grid in a Distributed Database Environment Hyoung-Gon Lee    2007 
62 IC  AsiaSim  The Cost Valuation Model for Reverse Supply Chain Using System Dynamics Hyunjong Jeong    2006 
61 IC  ICUT  A Framework for the Measurement of Supply Chain Performance in Ubiquitous Sensor Network Jaehyun Kong    2007 
60 IC  KGW  A study on due-date assignment method in wafer fabrication facility producing multiple product types file Jaewon Park    2005 
59 IC  APMS  Korea Smart Factory Program - Keynote Jinwoo Park  Jinwoo Park  2015 
58 IC  ICPR  The Effect of Enhanced Flexibility in the Reconfigurable Manufacturing Cell Jinwu S    2013 
57 IC  AsiaSim  A Study on the Effects of Highlighted Display on Knowledge Worker Productivity Jinwu Seo    2009 
56 IC  MITIP  Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard Jinwu Seo    2011