keywords Lay-out Planning, Priority Policy, Dynamic Programming, Simulation 
abstract Though numerous studies have dealt the lay-out planning methods for shipbuilding industry, in practice the lay-out planning is still done by people under the rule of thumb. It seems illogical to treat such key resource without any scientific management, however matters such as reliability, frequent modifications, and lack of data makes it hard to adapt an automated method in such spatial planning.
To investigate on this problem this paper examines a heavy industry company in Korea and executes a simulation study. The targeted company produces numerous types of offshore plants which all follows varying production processes. So it is told that there exists some special difficulties in predicting and managing newly given constructions. Also another characteristic that makes managing such work difficult is that there exists frequent change requests to design process, quantity, and schedule.
Like many other competitive companies, company H still relies solely on human resource to plan the lay-outs without using any automated systems. This could cause problems such as long hours spent in planning/evaluating the lay-out plan and the difficulty in attaining a substitute for such planning jobs. This is because the current lay-out planning process depends heavily on the experiences of the planner. The difficulty of training a worker to become such specialist is one thing, but to find a substitute in the case of emergency is a more serious problem.
To solve this problem this paper suggests a practical algorithm that can deploy the blocks under a short given time. The system would automatically prioritize the blocks that needs to be placed on the yards and find a location that could maximize the yard utilization and minimize the delays on the site. However because of the uncertainties in the field, such as assembly modifications, contract date delays, and variations in the processing time, it is extremely difficult to find an optimal solution in such short given time.
Studies done by Li(2005) have divided the lay-out process into two separate steps, prescheduling and spatial planning. Here the second step utilized the genetic algorithm. Other researches such as Raj(2007) treated this problem as a 3D bin packing problem, while Zheng(2011) approached this matter using greedy algorithm to minimize the makespan. However none of the previous works considered the uncertainties that exits on the spatial planning process.
So to aid the suggested problem this simulation study aims to find a priority rule to deploy the blocks while considering the uncertainties. Measures such as block size, delayed time of the selected block, and so on would be examined through simulation to find the best performing weights for such variables. Blocks will be prioritized under this rule and will be placed on the yards using the suggested algorithm.
A typical process of such simulation would go through following steps. The first step would be deciding the timeline of deployment. After selecting the timeline target project will be selected. The term project used here is a group of modules and blocks that needs to be placed on the yard. The next step would be choosing the weights for the priority rule. Measures such as delayed time, deployment time, and the size of the block would be considered. By simulating the model while varying the weights of such measures, we will be able to suggest the best performing block selecting policy rule for the spatial lay-out planning. 
번호 category 학회 제목 author presenter year
154 DC  (한국철도학회)  복구지원 리소스 현황 파악을 위한 관리체계 설계 Sumin Han    2014 
153 DC  CALS/EC  국내 주요 제조산업별 SWOT 분석 및 전략적 결정그리드 분석에 관한 연구 file Gyusun Hwang  Gyusun Hwang  2015 
152 DC  DB  A Preliminary Study: Database Technology for Computer Integrated Manufacturing Jusuk Park    1991 
151 DC  IT서비스春  조선 프로젝트 계약 방식에 착안한 SW 프로젝트 계약 방식 제안 Jinwu S    2013 
150 DC  KOSHAM  새로운 분류 알고리즘을 적용한 응급대응자원관리 시스템에 관한 연구 Sumin Han    2014 
149 DC  KSME  재구성 생산 시스템을 위한 스케줄러 및 시뮬레이터 개발 Sumin Han    2014 
148 DC  경영과학秋  BOM구조를 고려한 Job Shop 일정계획에 관한 연구 Chiho Moon    2009 
147 DC  경영과학秋  고장복구시간 예측기술의 스케줄링 활용 방안 Jinwu Seo    2010 
146 DC  경영과학秋  재해현장의 구호물류를 위한 분산계획 시스템에 대한 연구 Sumin Han    2013 
145 DC  경영과학秋  군용 항공기 일일 비행임무 계획을 위한 항공기 할당 문제 Jun-Ho Park    2011 
144 DC  경영과학秋  스마트 그리드 환경에서 제조기업의 에너지 효율화를 위한 스마트 생산 일정계획 Joon Yung Moon    2011 
143 DC  경영과학秋  SNU CIM-FMS Center : the first step for CIM Jintae Jang    1992 
142 DC  경영과학秋  Deadlock Control in Flexible Manufacturing with a Distributed Control Scheme Namkyu Park    1993 
141 DC  경영과학秋  A Comparative Analysis of Production Control Policies under Production Uncertainty Janghan Lee    1993 
140 DC  경영과학秋  Distributed Control of Shop Floor for Flexible Manufacturing System Namkyu Park    1993 
139 DC  경영과학秋  Development of Statistic data processing module for layout simulator Hosub Shin    1994 
138 DC  경영과학秋  군집합 방법을 이용한 모듈라 자재명세서 생성 Jonghan Kim    1997 
137 DC  경영과학秋  유전 알고리즘을 이용한 생산 및 분배 계획 Sungwon Jung    2001 
136 DC  경영과학秋  LP-Relaxation과 유전 알고리즘을 이용한 공급사슬설계 문제 Haejoong Kim    2002 
135 DC  경영통합학회  Software Development Effort Estimation Considering Complexity Using Radial Basis Function Network Youngwoo Kim    2010