author Kim Hyun Jun 
2nd author Jinwoo Park
Sunghoon Kim
Sang Hyup Lee
Seung Jin Ha 
presenter Kim Hyun Jun 
info This conference paper has been presented by Kim Hyun Jun the Asia-Simulation Conference. The conference has been held in Jeju, Korea, Republic of, 2015/11/04 ~ 2014/11/07 . 
year 2015 
category IC 
start / end date 2015-11-04 ~ 2015-11-07 
city / nation Jeju / Korea 
학회 AsiaSim 
keywords Lay-out Planning, Priority Policy, Dynamic Programming, Simulation 
abstract Though numerous studies have dealt the lay-out planning methods for shipbuilding industry, in practice the lay-out planning is still done by people under the rule of thumb. It seems illogical to treat such key resource without any scientific management, however matters such as reliability, frequent modifications, and lack of data makes it hard to adapt an automated method in such spatial planning.
To investigate on this problem this paper examines a heavy industry company in Korea and executes a simulation study. The targeted company produces numerous types of offshore plants which all follows varying production processes. So it is told that there exists some special difficulties in predicting and managing newly given constructions. Also another characteristic that makes managing such work difficult is that there exists frequent change requests to design process, quantity, and schedule.
Like many other competitive companies, company H still relies solely on human resource to plan the lay-outs without using any automated systems. This could cause problems such as long hours spent in planning/evaluating the lay-out plan and the difficulty in attaining a substitute for such planning jobs. This is because the current lay-out planning process depends heavily on the experiences of the planner. The difficulty of training a worker to become such specialist is one thing, but to find a substitute in the case of emergency is a more serious problem.
To solve this problem this paper suggests a practical algorithm that can deploy the blocks under a short given time. The system would automatically prioritize the blocks that needs to be placed on the yards and find a location that could maximize the yard utilization and minimize the delays on the site. However because of the uncertainties in the field, such as assembly modifications, contract date delays, and variations in the processing time, it is extremely difficult to find an optimal solution in such short given time.
Studies done by Li(2005) have divided the lay-out process into two separate steps, prescheduling and spatial planning. Here the second step utilized the genetic algorithm. Other researches such as Raj(2007) treated this problem as a 3D bin packing problem, while Zheng(2011) approached this matter using greedy algorithm to minimize the makespan. However none of the previous works considered the uncertainties that exits on the spatial planning process.
So to aid the suggested problem this simulation study aims to find a priority rule to deploy the blocks while considering the uncertainties. Measures such as block size, delayed time of the selected block, and so on would be examined through simulation to find the best performing weights for such variables. Blocks will be prioritized under this rule and will be placed on the yards using the suggested algorithm.
A typical process of such simulation would go through following steps. The first step would be deciding the timeline of deployment. After selecting the timeline target project will be selected. The term project used here is a group of modules and blocks that needs to be placed on the yard. The next step would be choosing the weights for the priority rule. Measures such as delayed time, deployment time, and the size of the block would be considered. By simulating the model while varying the weights of such measures, we will be able to suggest the best performing block selecting policy rule for the spatial lay-out planning. 
번호 category 학회 제목 author presenter year
154 DC  공동학회春  A Study on Hierarchical Approach for FMS Production Planning and Scheduling Problems Seongyoung Jang    1990 
153 DC  국제공동  An Integrated Production Planning Model for Flexible Manufacturing Systems Seongyoung Jang    1990 
152 DC  DB  A Preliminary Study: Database Technology for Computer Integrated Manufacturing Jusuk Park    1991 
151 DC  정보과학秋  Database Technology for Computer Integrated Manufuacturing Jusuk Park    1992 
150 DC  경영과학秋  SNU CIM-FMS Center : the first step for CIM Jintae Jang    1992 
149 DC  공동학회春  Implementation of a Production Planning and Scheduling Module for Operations of a Flexible Manufacturing and Assembly System Chankwon Park    1992 
148 DC  산업공학秋  A Study on the Production Planning and Scheduling Problem in a Flexible Chankwon Park    1992 
147 DC  경영과학秋  Deadlock Control in Flexible Manufacturing with a Distributed Control Scheme Namkyu Park    1993 
146 DC  경영과학秋  A Comparative Analysis of Production Control Policies under Production Uncertainty Janghan Lee    1993 
145 DC  경영과학秋  Distributed Control of Shop Floor for Flexible Manufacturing System Namkyu Park    1993 
144 DC  산업공학秋  A Study on the development of Computer-aided Process Planning System for Rotational Parts and its Management considering Machine Status Sungbum Chun    1993 
143 DC  자동제어  A Study on the FMS Shop Floor Control by Bidding among Autonomous Objects Jangsuk Moon    1993 
142 DC  산업공학秋  An Information Model for Shop Floor Control by Interfacing Databases with Expert Systems Namkyu Park    1993 
141 DC  산업공학秋  A Study on the FMS Shop Floor Control by Bidding among Autonomous Objects Jangsuk Moon    1993 
140 DC  공동학회春  A Study on Development of a Knowledge Based Scheduler and Knowledge Acquisition through Simulation Kitae Kim    1994 
139 DC  경영과학秋  Development of Statistic data processing module for layout simulator Hosub Shin    1994 
138 DC  전문가시스템秋  Knowledge Acquisition and Knowledge Based Scheduling System using Simulation Kitae Kim    1994 
137 DC  시뮬레이션秋  Effects of Part Release Polices to Performance of Manufacturing System Sangbok Woo    1994 
136 DC  산업공학秋  A Study on View Integration in Entity-Relation data model Kitae Shin    1994 
135 DC  공동학회春  A Study on the Group Scheduling Problem in Cellular Manufacturing System Jaesoo Shim    1995