author Young-woo Kim 
2nd author Jinwoo Park 
presenter Young-woo Kim 
info 27th European Conference on Operational Research 
year 2015 
category IC 
start / end date 2015.07.10 ~ 2015.07.13 
city / nation Glasgow, Scotland 
학회 EURO 
keywords Production Planning, Internet-of-Things, Closed-loop Supply Chain Management, Industrial Ecology 
abstract Efficient operation of a closed-loop supply chain should be supported by reasonably good forward and reverse processes. However there exists the chronic problem of uncertainty about returned end of life (EOL) products with regard to timing, quality and quantity, which hin-ders the efficient operation of closed-loop supply chain. In this study, we present a frame-work of lifecycle data management system which gathers data of products and components under the Internet-of-Things (IoT) scenario. The proposed system enables information sharing among all entities in the supply chain and enables us to grasp the actual condition of the re-turned products with good accuracy. Thereby the proposed system helps us to improve the process for disassembly and product disposition to minimize cost of the total system. First, we develop a mathematical model of a closed-loop supply chain within the IoT-based infor-mation sharing environment consisting of a supplier, a manufacturer, and a reprocessing facili-ty in 3 different markets, namely original, refurbish and spare parts. Next we address a multi-period production planning model for multiple products consisting of multiple components with the objective of minimizing the sum of all incurred costs from the standpoint of a manu-facturer. We also analyze the behavioral characteristics of the model and conduct experiments to justify the proposed scheme. 

.

번호 category 학회 제목 author presenter year
154 DC  공동학회春  생산계획 단계를 고려한 Job shop 환경에서 Order Release 정책의 유효성 관한 연구 Byeongdae Choi    1999 
153 DC  공동학회春  Implementation of a Production Planning and Scheduling Module for Operations of a Flexible Manufacturing and Assembly System Chankwon Park    1992 
152 DC  산업공학秋  A Study on the Production Planning and Scheduling Problem in a Flexible Chankwon Park    1992 
151 DC  공동학회春  Function-to-Process Flow Model Transformation for Design of CIM Chankwon Park    1996 
150 DC  경영과학秋  BOM구조를 고려한 Job Shop 일정계획에 관한 연구 Chiho Moon    2009 
149 DC  한국SCM  역공급사슬 구현을 위한 Reference Model 개발 및 전략적 RoadMap에 관한 연구 Chihoon Lim    2005 
148 DC  공동학회春  Manufacturing/Remanufacturing 환경에서의 유전 알고리즘을 이용한 생산계획 Chihoon Lim    2005 
147 DC  공동학회春  Development of a Shop-floor Scheduling and Control Software Based on Bidding Algorithm Daeyoung Chung    1995 
146 DC  시뮬레이션秋  금형 생산 시스템의 일정 계획 시스템 개발에 관한 연구 Daeyoung Chung    1997 
145 DC  산업공학秋  외주를 고려한 납기제약 일정계획 문제에 관한 연구 Daeyoung Chung    1998 
144 DC  공동학회春  생산능력 조정을 고려한 Job Shop 일정계획 문제에 관한 연구 Daeyoung Chung    1999 
143 DC  산업공학秋  분산객체와 XML 기반의 생산관리 컴포넌트 개발에 관한 연구 Daiki Min    2000 
142 DC  공동학회春  분산전원을 고려한 전기자동차 배터리교환소 최적 운영 모델 Donghyun Kim    2013 
141 DC  산업공학秋  마이크로그리드 환경을 고려한 전기자동차 배터리교환소 운영모델 Donghyun Kim    2013 
140 DC  시뮬레이션秋  시스템 다이내믹스를 이용한 자동차 역공급사슬의 정량적 분석 Dongjoon Lim    2005 
139 DC  공동학회春  Indoor Location System using Vision and RFID Technology Dongmyung Lee    2007 
138 DC  산업공학秋  Job Shop 조기완료시간 및 납기지연시간을 최소화하는 방법에 대한 연구 file Dongsu Park    1999 
137 DC  산업공학秋  공급 사슬상에서 생산/유통 시스템의 계층적 계획에 관한 연구 file Dosung Go    1999 
136 DC  공동학회春  제조 셀의 의사결정지원을 위한 음성인식 시스템의 구현에 관한 연구 Eoksu Sim    1999 
135 DC  한국SCM春  SC Network Design Considering Multi-level, Multi-product, Capacitated Facility Eoksu Sim    2000