author Sumin Han 
2nd author Sumin Han 
presenter Gyusun Hwang 
info ICDMCE 2016 
year 2016 
category IC 
start / end date 2016-04-13 
city / nation Kyoto/ Japan 
학회 ICDMCE 
keywords Internet of Things, Disaster management, Response system, Resource Allocation 
abstract In Korea, the damage recovery cost of water side structure accounts for more than 50% of the supplementary budget. Therefore previous studies have targeted the water sided structures to build an effective disaster recovery plan and better manage the recovery resources. However there has been only a little attention paid to collecting and capturing the real-time data. For most disaster recovery process, recovering multiple numbers of damaged sites is common. Therefore it is important to collect the real-time information of the damage, recovery resource, and etc., since these components are essential to make an effective recovery plan. However the dynamic characteristics of recovery process and planning make it difficult to gather such data.
This study seeks to design an effective disaster response system using the concept of Internet of Things (IoT) in order to lessen the impact of disasters. For this reason, this study defines and classifies the unexpected situations into cases and presents the architecture of the response system using IoT. Also, we have developed the method to evaluate the recovery resources capabilities and resource allocation algorithm which utilizes the data collected from IoT. Finally a simulation study has been conducted to verify the proposed system. The works from study will help identify the real-time recovery situation with IoT and allocate recovery resources to various damaged areas optimally. 

.

번호 category 학회 제목 author presenter year
154 DC  공동학회春  A Study on Hierarchical Approach for FMS Production Planning and Scheduling Problems Seongyoung Jang    1990 
153 DC  국제공동  An Integrated Production Planning Model for Flexible Manufacturing Systems Seongyoung Jang    1990 
152 DC  DB  A Preliminary Study: Database Technology for Computer Integrated Manufacturing Jusuk Park    1991 
151 DC  정보과학秋  Database Technology for Computer Integrated Manufuacturing Jusuk Park    1992 
150 DC  경영과학秋  SNU CIM-FMS Center : the first step for CIM Jintae Jang    1992 
149 DC  공동학회春  Implementation of a Production Planning and Scheduling Module for Operations of a Flexible Manufacturing and Assembly System Chankwon Park    1992 
148 DC  산업공학秋  A Study on the Production Planning and Scheduling Problem in a Flexible Chankwon Park    1992 
147 DC  경영과학秋  Deadlock Control in Flexible Manufacturing with a Distributed Control Scheme Namkyu Park    1993 
146 DC  경영과학秋  A Comparative Analysis of Production Control Policies under Production Uncertainty Janghan Lee    1993 
145 DC  경영과학秋  Distributed Control of Shop Floor for Flexible Manufacturing System Namkyu Park    1993 
144 DC  산업공학秋  A Study on the development of Computer-aided Process Planning System for Rotational Parts and its Management considering Machine Status Sungbum Chun    1993 
143 DC  자동제어  A Study on the FMS Shop Floor Control by Bidding among Autonomous Objects Jangsuk Moon    1993 
142 DC  산업공학秋  An Information Model for Shop Floor Control by Interfacing Databases with Expert Systems Namkyu Park    1993 
141 DC  산업공학秋  A Study on the FMS Shop Floor Control by Bidding among Autonomous Objects Jangsuk Moon    1993 
140 DC  공동학회春  A Study on Development of a Knowledge Based Scheduler and Knowledge Acquisition through Simulation Kitae Kim    1994 
139 DC  경영과학秋  Development of Statistic data processing module for layout simulator Hosub Shin    1994 
138 DC  전문가시스템秋  Knowledge Acquisition and Knowledge Based Scheduling System using Simulation Kitae Kim    1994 
137 DC  시뮬레이션秋  Effects of Part Release Polices to Performance of Manufacturing System Sangbok Woo    1994 
136 DC  산업공학秋  A Study on View Integration in Entity-Relation data model Kitae Shin    1994 
135 DC  공동학회春  A Study on the Group Scheduling Problem in Cellular Manufacturing System Jaesoo Shim    1995