author Daeyoung Chung 
2nd author / Kichang Lee (Presenter) (Dept. of Industrial Engineering, Seoul National University)
/ Kitae Shin (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 2000년 08월 02일 ~ 2000년 08월 04일
City: Bangkok
Nation: Thailand
Additional Information: 
year 2000 
category IC 
start / end date  
city / nation  
학회 ICPR 
keywords Job Shop, Scheduling, Due Date 
abstract We consider a kind of job shop scheduling problem where each job has its due date. Temporal adjustment of machine capacities is possible through outsourcing with subcontractors when the due dates cannot be kept. In practice, outsourcing of operations is not rare in many types of manufacturing industries. e.g. machining, printing, etc. And practice of outsourcing will increase in accordance, with the emerging new manufacturing paradigms, such as virtual or holonic manufacturing. We present a heuristic solution procedure that addresses the total job-shop scheduling problem by solving a series of smaller sub-problems to optimality. For the sake of efficiency,the algorithm repeatedly executes in two steps on bottleneck machines-(1)improving the sequence of operations and (2) picking out the operations to be subcontracted. Experimental results prove that the suggested algorithm outperforms traditional methods. 

Download:

번호 category 학회 제목 author presenter year
75 IC  GECCO  Solving Multi-level Lot Sizing Problem with Memetic Algorithm based on Refinement Procedure file Haejoong Kim    2006 
74 IC  ISCM  Integrated Models for Multi-level Planning and Scheduling in Supply Chain Haejoong Kim    2006 
73 IC  AsiaSim  A Model and Analysis of the Bullwhip Effect Using a SCOR-based Framework Haejoong Kim    2007 
72 IC  CIE  A batch splitting heuristic for dynamic job shop scheduling problem Hanil Jeong    1996 
71 IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
70 IC  APMS  Supply Chain Planning in Open Business Environment based on Business Patterns Hanil Jeong    2010 
69 IC  APMS  A new Approach for finite Capacity Planning in MRP Environment Hongbum Na    2006``` 
68 IC  PLM  Designing Product Platform for Efficient Production Planning Process Hongbum Na    2008 
67 IC  ICPR  A New Scheduling Paradigm Based on Farsighted Indices Hongbum Na    2009 
66 IC  ICPR  A study on scheduling and rescheduling problem of the FMC during transient disturbance period with pallet constraints Hongbum Na    2011 
65 IC  CIE  A decision support model for the initial design of FMS Hosub Shin    1996 
64 IC  IIE  Development of a Grid-Enabled MRP Process in RFID-Based APS Hyoung-Gon Lee    2007 
63 IC  ICPR  A High Performance MRP Part Explosion Process using Computational Grid in a Distributed Database Environment Hyoung-Gon Lee    2007 
62 IC  AsiaSim  The Cost Valuation Model for Reverse Supply Chain Using System Dynamics Hyunjong Jeong    2006 
61 IC  ICUT  A Framework for the Measurement of Supply Chain Performance in Ubiquitous Sensor Network Jaehyun Kong    2007 
60 IC  KGW  A study on due-date assignment method in wafer fabrication facility producing multiple product types file Jaewon Park    2005 
59 IC  APMS  Korea Smart Factory Program - Keynote Jinwoo Park  Jinwoo Park  2015 
58 IC  ICPR  The Effect of Enhanced Flexibility in the Reconfigurable Manufacturing Cell Jinwu S    2013 
57 IC  AsiaSim  A Study on the Effects of Highlighted Display on Knowledge Worker Productivity Jinwu Seo    2009 
56 IC  MITIP  Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard Jinwu Seo    2011