author Young-woo Kim 
2nd author Jinwoo Park 
presenter Young-woo Kim 
info 27th European Conference on Operational Research 
year 2015 
category IC 
start / end date 2015.07.10 ~ 2015.07.13 
city / nation Glasgow, Scotland 
학회 EURO 
keywords Production Planning, Internet-of-Things, Closed-loop Supply Chain Management, Industrial Ecology 
abstract Efficient operation of a closed-loop supply chain should be supported by reasonably good forward and reverse processes. However there exists the chronic problem of uncertainty about returned end of life (EOL) products with regard to timing, quality and quantity, which hin-ders the efficient operation of closed-loop supply chain. In this study, we present a frame-work of lifecycle data management system which gathers data of products and components under the Internet-of-Things (IoT) scenario. The proposed system enables information sharing among all entities in the supply chain and enables us to grasp the actual condition of the re-turned products with good accuracy. Thereby the proposed system helps us to improve the process for disassembly and product disposition to minimize cost of the total system. First, we develop a mathematical model of a closed-loop supply chain within the IoT-based infor-mation sharing environment consisting of a supplier, a manufacturer, and a reprocessing facili-ty in 3 different markets, namely original, refurbish and spare parts. Next we address a multi-period production planning model for multiple products consisting of multiple components with the objective of minimizing the sum of all incurred costs from the standpoint of a manu-facturer. We also analyze the behavioral characteristics of the model and conduct experiments to justify the proposed scheme. 

.

번호 category 학회 제목 author presenter year
75 IC  GECCO  Solving Multi-level Lot Sizing Problem with Memetic Algorithm based on Refinement Procedure file Haejoong Kim    2006 
74 IC  ISCM  Integrated Models for Multi-level Planning and Scheduling in Supply Chain Haejoong Kim    2006 
73 IC  AsiaSim  A Model and Analysis of the Bullwhip Effect Using a SCOR-based Framework Haejoong Kim    2007 
72 IC  CIE  A batch splitting heuristic for dynamic job shop scheduling problem Hanil Jeong    1996 
71 IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
70 IC  APMS  Supply Chain Planning in Open Business Environment based on Business Patterns Hanil Jeong    2010 
69 IC  APMS  A new Approach for finite Capacity Planning in MRP Environment Hongbum Na    2006``` 
68 IC  PLM  Designing Product Platform for Efficient Production Planning Process Hongbum Na    2008 
67 IC  ICPR  A New Scheduling Paradigm Based on Farsighted Indices Hongbum Na    2009 
66 IC  ICPR  A study on scheduling and rescheduling problem of the FMC during transient disturbance period with pallet constraints Hongbum Na    2011 
65 IC  CIE  A decision support model for the initial design of FMS Hosub Shin    1996 
64 IC  IIE  Development of a Grid-Enabled MRP Process in RFID-Based APS Hyoung-Gon Lee    2007 
63 IC  ICPR  A High Performance MRP Part Explosion Process using Computational Grid in a Distributed Database Environment Hyoung-Gon Lee    2007 
62 IC  AsiaSim  The Cost Valuation Model for Reverse Supply Chain Using System Dynamics Hyunjong Jeong    2006 
61 IC  ICUT  A Framework for the Measurement of Supply Chain Performance in Ubiquitous Sensor Network Jaehyun Kong    2007 
60 IC  KGW  A study on due-date assignment method in wafer fabrication facility producing multiple product types file Jaewon Park    2005 
59 IC  APMS  Korea Smart Factory Program - Keynote Jinwoo Park  Jinwoo Park  2015 
58 IC  ICPR  The Effect of Enhanced Flexibility in the Reconfigurable Manufacturing Cell Jinwu S    2013 
57 IC  AsiaSim  A Study on the Effects of Highlighted Display on Knowledge Worker Productivity Jinwu Seo    2009 
56 IC  MITIP  Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard Jinwu Seo    2011