249 | IC | ICIMSA |
Internet of Things-Enabled Supply Chain Performance Measurement Model
| Abdallah J. Dweekat | Abdallah J. Dweekat | 2016 |
248 | DC | 공동학회春 |
생산계획 단계를 고려한 Job shop 환경에서 Order Release 정책의 유효성 관한 연구
| Byeongdae Choi | | 1999 |
247 | IC | ICPR |
A Study on FMS Scheduling Problems Based on Priority Functions Generated by Genetic Programming
| ChangUk Kim | | 1997 |
246 | IC | SISE |
Inventory Management System using 3D-Camera & Deep Learning
| Chanho Hwang | Chanho Hwang | 2016 |
245 | DC | 공동학회春 |
Implementation of a Production Planning and Scheduling Module for Operations of a Flexible Manufacturing and Assembly System
| Chankwon Park | | 1992 |
244 | DC | 산업공학秋 |
A Study on the Production Planning and Scheduling Problem in a Flexible
| Chankwon Park | | 1992 |
243 | DC | 공동학회春 |
Function-to-Process Flow Model Transformation for Design of CIM
| Chankwon Park | | 1996 |
242 | DC | 경영과학秋 |
BOM구조를 고려한 Job Shop 일정계획에 관한 연구
| Chiho Moon | | 2009 |
241 | DC | 한국SCM |
역공급사슬 구현을 위한 Reference Model 개발 및 전략적 RoadMap에 관한 연구
| Chihoon Lim | | 2005 |
240 | DC | 공동학회春 |
Manufacturing/Remanufacturing 환경에서의 유전 알고리즘을 이용한 생산계획
| Chihoon Lim | | 2005 |
239 | IC | APIEMS |
A study on relieving electric power shortage by on-site solar power supply
| CHOE SANG YUN | CHOE SANG YUN | 2014 |
238 | IC | IEOM |
Relieving electric power dependency during shortage with an on-site solar power supply
| CHOE SANG YUN | CHOE SANG YUN | 2015 |
237 | IC | ICPR |
An Algrorithm for Job Shop Scheduling Problem with Due Date Constraints Considering Operation Subcontract
| Daeyoung Chung | | 2000 |
236 | IC | PEDAC |
A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness
| Daeyoung Chung | | 2001 |
235 | DC | 공동학회春 |
Development of a Shop-floor Scheduling and Control Software Based on Bidding Algorithm
| Daeyoung Chung | | 1995 |
234 | DC | 시뮬레이션秋 |
금형 생산 시스템의 일정 계획 시스템 개발에 관한 연구
| Daeyoung Chung | | 1997 |
233 | DC | 산업공학秋 |
외주를 고려한 납기제약 일정계획 문제에 관한 연구
| Daeyoung Chung | | 1998 |
232 | DC | 공동학회春 |
생산능력 조정을 고려한 Job Shop 일정계획 문제에 관한 연구
| Daeyoung Chung | | 1999 |
231 | DC | 산업공학秋 |
분산객체와 XML 기반의 생산관리 컴포넌트 개발에 관한 연구
| Daiki Min | | 2000 |
230 | DC | 공동학회春 |
분산전원을 고려한 전기자동차 배터리교환소 최적 운영 모델
| Donghyun Kim | | 2013 |
229 | DC | 산업공학秋 |
마이크로그리드 환경을 고려한 전기자동차 배터리교환소 운영모델
| Donghyun Kim | | 2013 |
228 | IC | ICLS |
Modeling and Optimization of Cost-effective Charging Scheduling for the Battery Switch Stations of Electric Vehicles
| Donghyun Kim | | 2012 |
227 | DC | 시뮬레이션秋 |
시스템 다이내믹스를 이용한 자동차 역공급사슬의 정량적 분석
| Dongjoon Lim | | 2005 |
» | DC | 공동학회春 |
Indoor Location System using Vision and RFID Technology
| Dongmyung Lee | | 2007 |
225 | IC | ICOIN |
Analysis of Paris Metro Pricing for Wireless Internet Services
| Dongmyung Lee | | 2011 |
224 | IC | GameNets |
Paris Metro Pricing for Internet Service Differentiation
| Dongmyung Lee | | 2011 |
223 | IC | ICQT |
A Token Pricing Scheme for Internet Services
| Dongmyung Lee | | 2011 |
222 | IC | W-PIN |
ISP vs. ISP+CDN: Can ISPs in Duopoly Profit by Introducing CDN Services?
| Dongmyung Lee | | 2012 |
221 | DC | 산업공학秋 |
Job Shop 조기완료시간 및 납기지연시간을 최소화하는 방법에 대한 연구
| Dongsu Park | | 1999 |
220 | DC | 산업공학秋 |
공급 사슬상에서 생산/유통 시스템의 계층적 계획에 관한 연구
| Dosung Go | | 1999 |
219 | IC | SCSC |
Performance Evaluation of Alternative Designs for the Car Recycling System Using Simulation Analysis
| Eoksu Sim | | 2004 |
218 | IC | GECCO |
A Generic Network Design for a Closed-loop Supply Chain Using Genetic Algorithm
| Eoksu Sim | | 2004 |
217 | IC | AsiaSim |
Performance Analysis of Alternative Designs for a Vehicle Disassembly System using Simulation Modeling
| Eoksu Sim | | 2004 |
216 | DC | 공동학회春 |
제조 셀의 의사결정지원을 위한 음성인식 시스템의 구현에 관한 연구
| Eoksu Sim | | 1999 |
215 | DC | 한국SCM春 |
SC Network Design Considering Multi-level, Multi-product, Capacitated Facility
| Eoksu Sim | | 2000 |
214 | DC | 공동학회春 |
QFD와 인공지능기법을 이용한 사출금형의 견적 지원 시스템
| Gunhee Kim | | 2003 |
213 | IC | Asian eBiz |
Integration of RFID and Web Services Technology in MES
| Gunnam Ong | | 2007 |
212 | DC | 공동학회春 |
함정 설계 및 생산에서의 GT 응용에 관한 연구
| Gwangjae Park | | 2006 |
211 | DC | 산업공학秋 |
제조 실행시스템의 성과 측정을 위한 프레임워크 개발 연구
| Gyusun Hwang | | 2012 |
210 | DC | 시뮬레이션春 |
AnyLogic을 활용한 종합병원 건강검진센터의 서비스 개선 연구
| Gyusun Hwang | | 2013 |
209 | DC | 한국SCM |
지속적인 개선을 위한 제조성과 평가방법론 개발 연구
| Gyusun Hwang | | 2014 |
208 | DC | CALS/EC |
국내 주요 제조산업별 SWOT 분석 및 전략적 결정그리드 분석에 관한 연구
| Gyusun Hwang | Gyusun Hwang | 2015 |
207 | DC | 공동학회春 |
제조 실행시스템의 성과 측정을 위한 프레임워크 개발 연구
| Gyusun Hwang | | 2012 |
206 | IC | ICPR |
Business Process Modeling for developing a performance measurement system using the Internet of Things
| Gyusun Hwang | Jinwoo Park | 2015 |
205 | IC | APORS |
Developing performance measurement framework for MES (Manufacturing Execution System)
| Gyusun Hwang | | 2012 |
204 | IC | JCIMT |
Operational Performance metrics in manufacturing process: Based on SCOR model and RFID technology
| Gyusun Hwang | | 2014 |
203 | IC | IJIE |
DEVELOPING GOOD QUALITY PERFORMANCE MEASURMENT MODEL TOWARD SMART FACTORY
| Gyusun Hwang | Gyusun Hwang | 2016 |
202 | DC | 공동학회春 |
한국의 자동차 Reverse Supply Chain의 효율적 운영을 위한 정책에 관한 연구
| Haejoong Kim | | 2006 |
201 | IC | GECCO |
Solving Multi-level Lot Sizing Problem with Memetic Algorithm based on Refinement Procedure
| Haejoong Kim | | 2006 |
200 | IC | ISCM |
Integrated Models for Multi-level Planning and Scheduling in Supply Chain
| Haejoong Kim | | 2006 |
199 | IC | AsiaSim |
A Model and Analysis of the Bullwhip Effect Using a SCOR-based Framework
| Haejoong Kim | | 2007 |
198 | DC | 경영과학秋 |
LP-Relaxation과 유전 알고리즘을 이용한 공급사슬설계 문제
| Haejoong Kim | | 2002 |
197 | DC | 공동학회春 |
자동차부품의 재활용률 증대를 위한 역공급사슬에 관한 연구
| Haejoong Kim | | 2004 |
196 | DC | 한국SCM春 |
자동차부품의 역공급사슬 구성에 관한 연구
| Haejoong Kim | | 2004 |
195 | IC | CIE |
A batch splitting heuristic for dynamic job shop scheduling problem
| Hanil Jeong | | 1996 |
194 | IC | PCM |
An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment
| Hanil Jeong | | 1996 |
193 | DC | 공동학회春 |
An Approximation Method for Job Shop Scheduling Problem with Sequence Independent Setup Time
| Hanil Jeong | | 1996 |
192 | IC | APMS |
Supply Chain Planning in Open Business Environment based on Business Patterns
| Hanil Jeong | | 2010 |
191 | DC | 정밀공학 |
트리 구조의 BOM에 기초한 고성능 MRP 시스템
| Hongbum Na | | 2006 |
190 | DC | 정밀공학 |
산업별 특징에 따른 스케줄링 소프트웨어 개발에 관한 연구
| Hongbum Na | | 2008 |
189 | DC | 정밀공학 |
제조공정의 특징에 따른 우선순위 규칙 기반의 스케줄링 방법
| Hongbum Na | | 2009 |
188 | IC | APMS |
A new Approach for finite Capacity Planning in MRP Environment
| Hongbum Na | | 2006``` |
187 | IC | PLM |
Designing Product Platform for Efficient Production Planning Process
| Hongbum Na | | 2008 |
186 | IC | ICPR |
A New Scheduling Paradigm Based on Farsighted Indices
| Hongbum Na | | 2009 |
185 | IC | ICPR |
A study on scheduling and rescheduling problem of the FMC during transient disturbance period with pallet constraints
| Hongbum Na | | 2011 |
184 | IC | CIE |
A decision support model for the initial design of FMS
| Hosub Shin | | 1996 |
183 | DC | 경영과학秋 |
Development of Statistic data processing module for layout simulator
| Hosub Shin | | 1994 |
182 | DC | 공동학회春 |
A Study on Part Selection Problem at Initial Design Stage of FMS
| Hosub Shin | | 1996 |
181 | IC | IIE |
Development of a Grid-Enabled MRP Process in RFID-Based APS
| Hyoung-Gon Lee | | 2007 |
180 | IC | ICPR |
A High Performance MRP Part Explosion Process using Computational Grid in a Distributed Database Environment
| Hyoung-Gon Lee | | 2007 |
179 | DC | 정밀공학 |
컴퓨터 비전기술을 이용한 작업측정방법의 개선과 ERP 응용에 관한 연구
| Hyoung-Gon Lee | | 2004 |
178 | DC | 정밀공학 |
ERP 환경에서 MRP 부품전개의 속도향상에 관한 연구
| Hyoung-Gon Lee | | 2005 |
177 | DC | 산업공학秋 |
다중사업 수행환경에서 획득가치를 기반한 각 작업의 일정, 비용 통합에 관한 연구
| Hyunil Noh | | 2006 |
176 | DC | 시뮬레이션秋 |
역공급사슬 구축 및 운영 비용 산출 방밥에 관한 연구
| Hyunjong Jeong | | 2006 |
175 | IC | AsiaSim |
The Cost Valuation Model for Reverse Supply Chain Using System Dynamics
| Hyunjong Jeong | | 2006 |
174 | DC | 산업공학秋 |
전기 자동차 보급 활성화를 위한 관련 정책 연구
| Hyunjun Kim | | 2014 |
173 | DC | 공동학회秋 |
A Study on Modeling and Control of an FMC using Finitely Recursive Process
| Jaeheuk Choi | | 1995 |
172 | DC | 공동학회春 |
주문비용 감축과 판촉에 대한 투자 의사결정에 대한 연구
| Jaehoon Seoung | | 2001 |
171 | DC | 한국SCM春 |
판촉비용과 주문비용 감소효과의 분배자 이익에 미치는 영향 분석
| Jaehoon Seoung | | 2001 |
170 | IC | ICUT |
A Framework for the Measurement of Supply Chain Performance in Ubiquitous Sensor Network
| Jaehyun Kong | | 2007 |
169 | DC | 공동학회春 |
A Study on the Group Scheduling Problem in Cellular Manufacturing System
| Jaesoo Shim | | 1995 |
168 | IC | KGW |
A study on due-date assignment method in wafer fabrication facility producing multiple product types
| Jaewon Park | | 2005 |
167 | DC | 경영과학秋 |
A Comparative Analysis of Production Control Policies under Production Uncertainty
| Janghan Lee | | 1993 |
166 | DC | 자동제어 |
A Study on the FMS Shop Floor Control by Bidding among Autonomous Objects
| Jangsuk Moon | | 1993 |
165 | DC | 산업공학秋 |
A Study on the FMS Shop Floor Control by Bidding among Autonomous Objects
| Jangsuk Moon | | 1993 |
164 | DC | 한국SCM |
RFID 기술을 활용한 공급 사슬의 성과 측정 프레임워크에 관한 연구
| Jangwon Cho | | 2006 |
163 | DC | 시뮬레이션春 |
공급 사슬에서 RFID 기술의 직접적인 효과 분석
| Jangwon Cho | | 2007 |
162 | DC | 공동학회春 |
셋업과 팔렛 제약을 고려한 상황에서의 RMC scheduling
| Jeongho Park | | 2010 |
161 | DC | 공동학회春 |
좌표 개념을 활용한 Variant BOM 설계의 새로운 접근법
| Jinseon Yoo | | 2006 |
160 | DC | 경영과학秋 |
SNU CIM-FMS Center : the first step for CIM
| Jintae Jang | | 1992 |
159 | DC | 산업융합학회 |
융합물류와 경영과학
| Jinwoo Park | | 2011 |
158 | IC | APMS |
Korea Smart Factory Program - Keynote
| Jinwoo Park | Jinwoo Park | 2015 |
157 | DC | IT서비스春 |
조선 프로젝트 계약 방식에 착안한 SW 프로젝트 계약 방식 제안
| Jinwu S | | 2013 |
156 | IC | ICPR |
The Effect of Enhanced Flexibility in the Reconfigurable Manufacturing Cell
| Jinwu S | | 2013 |
155 | DC | 정밀공학 |
스케줄링에서 변동 예측 기술의 활용
| Jinwu Seo | | 2010 |
154 | DC | 경영과학秋 |
고장복구시간 예측기술의 스케줄링 활용 방안
| Jinwu Seo | | 2010 |
153 | DC | 경영통합학회 |
프로젝트 관리 방식에 근거한 SW 엔지니어링 계량 방식에 대한 연구
| Jinwu Seo | | 2013 |
152 | DC | 정밀공학 |
재구성생산시스템을 위한 생산능력 시뮬레이터 개발
| Jinwu Seo | | 2013 |
151 | DC | 공동학회春 |
재구성형생산셀을 위한 통합 스케줄링 프레임워크
| Jinwu Seo | | 2012 |
150 | IC | AsiaSim |
A Study on the Effects of Highlighted Display on Knowledge Worker Productivity
| Jinwu Seo | | 2009 |