author Hanil Jeong 
2nd author / Kidong Kim (Dept. of Industrial Engineering, Seoul National University)
/ Chankwon Park (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University)
/ Seongyoung Jang (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 1996년 10월 29일 ~ 1996년 10월 31일
City: Seoul
Nation: Korea
Additional Information: Vol. I, 337-342 
year 1996 
category IC 
start / end date  
city / nation  
학회 PCM 
keywords Batch Splitting, Branch and Bound, Job Shop Schuduling 
abstract The job shop scheduling problem has been a major target for many researchers. Unfortunately, though, most of the past studies assumed that a job consists of only a single part. However, if we assume that a job consists of a batch as in many real manufacturing environment, and allow each part to be processed independently, then we can obtain an improved schedule because we can fill up the idle times of machines with jobs of smaller processing times. However, then, the size of the scheduling problem would become too large to be solved in practical time limit, and the clerical work will also increase to handle the increased number of production orders. And so, there may be an optimum batch size considering trade-off between better solution and tractability. Current study is the result of an attempt to find an acceptable solution when the production requirement from MRP(material requirement planning) system for a planning period exceeds the capacity of production system. We try to get an improved schedule by splitting the original batch into smaller batches, and thereby meet the due date requirement without resorting to rescheduling of the master production schedule. For the given batch, we disaggregate the job processing time into smaller chunks according to the algorithm we are proposing. And then, a new branch and bound algorithm is applied to solve the transformed job shop scheduling problem. It also turned out that we can adapt to unexpected dynamic events more elegantly by allowing batch splitting. Experimental results are included to show the computational characteristics of the proposed approach and the efficiency of the proposed algorithm. 

Download:

번호 category 학회 제목 author presenter year
75 IC  GECCO  Solving Multi-level Lot Sizing Problem with Memetic Algorithm based on Refinement Procedure file Haejoong Kim    2006 
74 IC  ISCM  Integrated Models for Multi-level Planning and Scheduling in Supply Chain Haejoong Kim    2006 
73 IC  AsiaSim  A Model and Analysis of the Bullwhip Effect Using a SCOR-based Framework Haejoong Kim    2007 
72 IC  CIE  A batch splitting heuristic for dynamic job shop scheduling problem Hanil Jeong    1996 
» IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
70 IC  APMS  Supply Chain Planning in Open Business Environment based on Business Patterns Hanil Jeong    2010 
69 IC  APMS  A new Approach for finite Capacity Planning in MRP Environment Hongbum Na    2006``` 
68 IC  PLM  Designing Product Platform for Efficient Production Planning Process Hongbum Na    2008 
67 IC  ICPR  A New Scheduling Paradigm Based on Farsighted Indices Hongbum Na    2009 
66 IC  ICPR  A study on scheduling and rescheduling problem of the FMC during transient disturbance period with pallet constraints Hongbum Na    2011 
65 IC  CIE  A decision support model for the initial design of FMS Hosub Shin    1996 
64 IC  IIE  Development of a Grid-Enabled MRP Process in RFID-Based APS Hyoung-Gon Lee    2007 
63 IC  ICPR  A High Performance MRP Part Explosion Process using Computational Grid in a Distributed Database Environment Hyoung-Gon Lee    2007 
62 IC  AsiaSim  The Cost Valuation Model for Reverse Supply Chain Using System Dynamics Hyunjong Jeong    2006 
61 IC  ICUT  A Framework for the Measurement of Supply Chain Performance in Ubiquitous Sensor Network Jaehyun Kong    2007 
60 IC  KGW  A study on due-date assignment method in wafer fabrication facility producing multiple product types file Jaewon Park    2005 
59 IC  APMS  Korea Smart Factory Program - Keynote Jinwoo Park  Jinwoo Park  2015 
58 IC  ICPR  The Effect of Enhanced Flexibility in the Reconfigurable Manufacturing Cell Jinwu S    2013 
57 IC  AsiaSim  A Study on the Effects of Highlighted Display on Knowledge Worker Productivity Jinwu Seo    2009 
56 IC  MITIP  Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard Jinwu Seo    2011