author Daeyoung Chung 
2nd author / Kichang Lee (Presenter) (Dept. of Industrial Engineering, Seoul National University)
/ Kitae Shin (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 2000년 08월 02일 ~ 2000년 08월 04일
City: Bangkok
Nation: Thailand
Additional Information: 
year 2000 
category IC 
start / end date  
city / nation  
학회 ICPR 
keywords Job Shop, Scheduling, Due Date 
abstract We consider a kind of job shop scheduling problem where each job has its due date. Temporal adjustment of machine capacities is possible through outsourcing with subcontractors when the due dates cannot be kept. In practice, outsourcing of operations is not rare in many types of manufacturing industries. e.g. machining, printing, etc. And practice of outsourcing will increase in accordance, with the emerging new manufacturing paradigms, such as virtual or holonic manufacturing. We present a heuristic solution procedure that addresses the total job-shop scheduling problem by solving a series of smaller sub-problems to optimality. For the sake of efficiency,the algorithm repeatedly executes in two steps on bottleneck machines-(1)improving the sequence of operations and (2) picking out the operations to be subcontracted. Experimental results prove that the suggested algorithm outperforms traditional methods. 

Download:

번호 category 학회 제목 author presenter year
75 IC  FAIM 2016  A Study on the Distributed Vehicle Routing Problem of emergency vehicle fleet in the Disaster Scene file Sumin Han  Sumin Han  2016 
74 IC  ICDMCE  Study on smart disaster recovery system using Internet of Things file Sumin Han  Gyusun Hwang  2016 
73 IC  INFORMS  A Study on emergency logistics problem after massive natural disaster Sumin Han  Sumin Han  2014 
72 IC  ISII  Framework Design of Intelligent Service System for the Middle-of-Life Product Soyeon Yoon    2011 
71 IC  ICICIC  Evaluation of Intelligent Service System for the Middle-of-Life Product Soyeon Yoon    2011 
70 IC  INFORMS-KORMS  Development of capacitated event-driven MRP components using object oriented method Seunghyun Yoon    2000 
69 IC  IW on IMS  Maximally permissive adaptive control of an automated manufacturing cell Sangkyun Kim    1999 
68 IC  APIEMS  An Integrated Approach for Loading and Scheduling of a Flexible Manufactureing System Sangbok Woo    1999 
67 IC  ICPR  On-Site Safety Education in Factories Using Augmented Reality with Text Mining-based Marker file Philjun Moon  Philjun Moon  2017 
66 IC  SICEAS  INTERACTIVE PLACEMENT METHOD FOR CONTAINER LOADING PROBLEM USING DEPTH CAMERA file Nasution Ninan  Nasution Ninan  2017 
65 IC  APMS  Utility Value and Fairness Consideration for Information Sharing in a Supply Chain Myongran Oh    2007 
64 IC  APMS  A Framework for Enhancing Responsiveness in Sales Order Processing System Using Web Services and Ubiquitous Computing Technologies Mokmin Park    2009 
63 IC  ISFA  A framework for the ubiquitous MES using RFID and Web services technology file Manchul Han    2006 
62 IC  APMS  Development of a Strategic Model for Freight Transportation with a Case Study of the Far East Louis Coulet    2013 
61 IC  ICAT  A study on RFID user memory applications for production management and scheduling file Kyoungmin Kim  Kyoungmin Kim  2015 
60 IC  IEOM  A Real-time Information System Using RFID for Visually Impaired Kyounghwi Tae    2011 
59 IC  PAIS  Knowledge Acquisition using Neural Network and Simulator Kitae Shin    2001 
58 IC  e-Biz  Design of Information System for e-Logistics Kitae Shin    2004 
57 IC  ICCSA  Efficient Mapping Rule of IDEF for UMM Application file Kitae Shin    2005 
56 IC  ICRA  An On-Line Production Scheduler using Neural Network and Simulator based on Manufacturing System State file Kitae Kim    2001