author Gyusun Hwang 
2nd author Jinwoo Park 
presenter Jinwoo Park 
info  
year 2015 
category IC 
start / end date 2015-08-02 ~ 2015-08-06 
city / nation 마닐라/필리핀 
학회 ICPR 
keywords Business Process Modeling; Internet of Things; Performance measurement 
abstract The concept of Internet of Things (IoT) is important in collecting the shop floor data and transmitting it into the Information System in real time. The rapid proliferation of IoT in recent days has given rise to demands for clear definition among metrics as important sources of the performance measurement. This requirement comes from the various usage of IoT data: One raw IoT data is able to produce many metrics. In order to understand it, we need to consider the usage points of IoT data at different management levels. And by composing company management levels: Strategic level, Tactical level and Operational levels, we are able to analysis usage of IoT data among management levels.
The purpose of this study is to present the work flow of the performance measurement process with regard to monitoring the IoT outcomes. Also, we try to explore the core issues with Business Process Modelling and simulation. As a result of study, we expect that how IoT data is processed and which level needs an IoT data as a performance metrics.
We use BPM as a description of activities that constitute a performance measurement. Those are described in a graphical way using some components: Agent, Resources, Process, flow logic, and etc.The identification and discussion of result of BPM reflects how IoT data is handled and make a clear distinction of metrics usage among management levels. 
번호 category 학회 제목 author presenter year
35 IC  ICUT  A Framework for the Measurement of Supply Chain Performance in Ubiquitous Sensor Network Jaehyun Kong    2007 
34 IC  AsiaSim  The Cost Valuation Model for Reverse Supply Chain Using System Dynamics Hyunjong Jeong    2006 
33 IC  IIE  Development of a Grid-Enabled MRP Process in RFID-Based APS Hyoung-Gon Lee    2007 
32 IC  ICPR  A High Performance MRP Part Explosion Process using Computational Grid in a Distributed Database Environment Hyoung-Gon Lee    2007 
31 IC  CIE  A decision support model for the initial design of FMS Hosub Shin    1996 
30 IC  APMS  A new Approach for finite Capacity Planning in MRP Environment Hongbum Na    2006``` 
29 IC  PLM  Designing Product Platform for Efficient Production Planning Process Hongbum Na    2008 
28 IC  ICPR  A New Scheduling Paradigm Based on Farsighted Indices Hongbum Na    2009 
27 IC  ICPR  A study on scheduling and rescheduling problem of the FMC during transient disturbance period with pallet constraints Hongbum Na    2011 
26 IC  CIE  A batch splitting heuristic for dynamic job shop scheduling problem Hanil Jeong    1996 
25 IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
24 IC  APMS  Supply Chain Planning in Open Business Environment based on Business Patterns Hanil Jeong    2010 
23 IC  GECCO  Solving Multi-level Lot Sizing Problem with Memetic Algorithm based on Refinement Procedure file Haejoong Kim    2006 
22 IC  ISCM  Integrated Models for Multi-level Planning and Scheduling in Supply Chain Haejoong Kim    2006 
21 IC  AsiaSim  A Model and Analysis of the Bullwhip Effect Using a SCOR-based Framework Haejoong Kim    2007 
» IC  ICPR  Business Process Modeling for developing a performance measurement system using the Internet of Things file Gyusun Hwang  Jinwoo Park  2015 
19 IC  APORS  Developing performance measurement framework for MES (Manufacturing Execution System) Gyusun Hwang    2012 
18 IC  JCIMT  Operational Performance metrics in manufacturing process: Based on SCOR model and RFID technology Gyusun Hwang    2014 
17 IC  IJIE  DEVELOPING GOOD QUALITY PERFORMANCE MEASURMENT MODEL TOWARD SMART FACTORY Gyusun Hwang  Gyusun Hwang  2016 
16 IC  Asian eBiz  Integration of RFID and Web Services Technology in MES Gunnam Ong    2007