author Jaewon Park 
2nd author / Hyoung-Gon Lee (Presenter) (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 2005년 03월 14일 ~ 2005년 03월 15일
City: Seoul
Nation: Korea
Additional Information: 
year 2005 
category IC 
start / end date  
city / nation  
학회 KGW 
keywords wafer fabrication, due-date assignment, neural network 
abstract Assigning due date and delivering timely are an important factor determining the competitive strength of a manufacturing company. Once an order received, we should check the inventory status before anything else. If the stock runs short, we should make the product. In this case, predicting the cycle time of the product is important for the due date assignment.
Due to the complicated process flow of wafer fabrication, distinctive approaches that differ from common scheduling method are required. Especially, more than one thousand different products might be produced simultaneously in wafer fabrication facilities producing multiple product types like ASIC or power semiconductor. Besides, each product type has different process flow and product types and layers that can be processed together in each batch processing equipment are predetermined. Because of Such characteristics, estimating the flow time of each product is very difficult task.
In this study, we propose a method to predict the cycle time and assign the due date as accurately as possible even if the product mix varies continuously. For this, we group the products according to the similarity of process flow and use the information from the groups to predict the cycle time using artificial neural network. The experimental results show that the proposed method is superior to common due date assignment method. 
번호 category 학회 제목 author presenter year
15 IC  SCSC  Performance Evaluation of Alternative Designs for the Car Recycling System Using Simulation Analysis file Eoksu Sim    2004 
14 IC  GECCO  A Generic Network Design for a Closed-loop Supply Chain Using Genetic Algorithm file Eoksu Sim    2004 
13 IC  AsiaSim  Performance Analysis of Alternative Designs for a Vehicle Disassembly System using Simulation Modeling file Eoksu Sim    2004 
12 IC  ICOIN  Analysis of Paris Metro Pricing for Wireless Internet Services Dongmyung Lee    2011 
11 IC  GameNets  Paris Metro Pricing for Internet Service Differentiation Dongmyung Lee    2011 
10 IC  ICQT  A Token Pricing Scheme for Internet Services Dongmyung Lee    2011 
9 IC  W-PIN  ISP vs. ISP+CDN: Can ISPs in Duopoly Profit by Introducing CDN Services? Dongmyung Lee    2012 
8 IC  ICLS  Modeling and Optimization of Cost-effective Charging Scheduling for the Battery Switch Stations of Electric Vehicles Donghyun Kim    2012 
7 IC  ICPR  An Algrorithm for Job Shop Scheduling Problem with Due Date Constraints Considering Operation Subcontract Daeyoung Chung    2000 
6 IC  PEDAC  A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness Daeyoung Chung    2001 
5 IC  APIEMS  A study on relieving electric power shortage by on-site solar power supply CHOE SANG YUN  CHOE SANG YUN  2014 
4 IC  IEOM  Relieving electric power dependency during shortage with an on-site solar power supply CHOE SANG YUN  CHOE SANG YUN  2015 
3 IC  SISE  Inventory Management System using 3D-Camera & Deep Learning file Chanho Hwang  Chanho Hwang  2016 
2 IC  ICPR  A Study on FMS Scheduling Problems Based on Priority Functions Generated by Genetic Programming ChangUk Kim    1997 
1 IC  ICIMSA  Internet of Things-Enabled Supply Chain Performance Measurement Model file Abdallah J. Dweekat  Abdallah J. Dweekat  2016