author Hongbum Na 
2nd author  
presenter  
info This conference paper has been presented by Hongbum Na on the International Conference on Production Research. The conference has been held in Stuttgart, Germany, 2011/7/31 ~ 2011/8/4 . 
year 2011 
category IC 
start / end date  
city / nation  
학회 ICPR 
keywords FMC scheduling, pallet constraints, transient disturbance, rescheduling method 
abstract When trying to solve a flexible manufacturing cell (FMC) scheduling problem in certain types of industrial situation, not only the routing and sequencing problems but also the availability of pallets and loading/unloading (L/U) stations could be considered. In those situations, scheduling problems are constrained by the number of pallets, pallet operation policies and L/U station conditions because each job requires a setup with different types of pallets, which are performed at L/U stations.
In this study, overall scheduling process and several heuristic algorithms based on priority rules which utilize the information of pallets and L/U stations are introduced to generate good production schedules. The makespans of the machining centers and L/U stations are considered in a hierarchical manner. Considering practical shop environments, several types of transient disturbances such as preventive maintenance and machine breakdown are considered and several rescheduling methods are suggested 

Download :

번호 category 학회 제목 author presenter year
55 IC  IBERC  An Ontology-Based Framework for e-Business Integration file Tai-Woo Chang    2003 
54 IC  ICARCV  A Discrete Control Approach to Robotic Cell Operating System Design Jonghun Park    1996 
53 IC  ICAT  A study on RFID user memory applications for production management and scheduling file Kyoungmin Kim  Kyoungmin Kim  2015 
52 IC  ICCSA  Efficient Mapping Rule of IDEF for UMM Application file Kitae Shin    2005 
51 IC  ICDMCE  Study on smart disaster recovery system using Internet of Things file Sumin Han  Gyusun Hwang  2016 
50 IC  ICICIC  Evaluation of Intelligent Service System for the Middle-of-Life Product Soyeon Yoon    2011 
49 IC  ICIMSA  Internet of Things-Enabled Supply Chain Performance Measurement Model file Abdallah J. Dweekat  Abdallah J. Dweekat  2016 
48 IC  ICLS  Modeling and Optimization of Cost-effective Charging Scheduling for the Battery Switch Stations of Electric Vehicles Donghyun Kim    2012 
47 IC  ICMA  Machine-Understandable e-Business Modeling with Ontology Tai-Woo Chang    2002 
46 IC  ICOIN  Analysis of Paris Metro Pricing for Wireless Internet Services Dongmyung Lee    2011 
45 IC  ICPR  Business Process Modeling for developing a performance measurement system using the Internet of Things file Gyusun Hwang  Jinwoo Park  2015 
44 IC  ICPR  A Study on FMS Scheduling Problems Based on Priority Functions Generated by Genetic Programming ChangUk Kim    1997 
43 IC  ICPR  A Scheduling Algorithm considering Subcontract cost in MRP Environment Kichang Lee    1997 
42 IC  ICPR  An Algrorithm for Job Shop Scheduling Problem with Due Date Constraints Considering Operation Subcontract Daeyoung Chung    2000 
41 IC  ICPR  Development of a Decision Support System for the formulation of Manufacturing Kichang Lee    2001 
40 IC  ICPR  Combined production and distribution planning using demand based mixed Genetic Algorithm in a supply chain file Sungwon Jung    2003 
39 IC  ICPR  A High Performance MRP Part Explosion Process using Computational Grid in a Distributed Database Environment Hyoung-Gon Lee    2007 
38 IC  ICPR  A New Scheduling Paradigm Based on Farsighted Indices Hongbum Na    2009 
» IC  ICPR  A study on scheduling and rescheduling problem of the FMC during transient disturbance period with pallet constraints Hongbum Na    2011 
36 IC  ICPR  The Effect of Enhanced Flexibility in the Reconfigurable Manufacturing Cell Jinwu S    2013