author Jaewon Park 
2nd author / Hyoung-Gon Lee (Presenter) (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 2005년 03월 14일 ~ 2005년 03월 15일
City: Seoul
Nation: Korea
Additional Information: 
year 2005 
category IC 
start / end date  
city / nation  
학회 KGW 
keywords wafer fabrication, due-date assignment, neural network 
abstract Assigning due date and delivering timely are an important factor determining the competitive strength of a manufacturing company. Once an order received, we should check the inventory status before anything else. If the stock runs short, we should make the product. In this case, predicting the cycle time of the product is important for the due date assignment.
Due to the complicated process flow of wafer fabrication, distinctive approaches that differ from common scheduling method are required. Especially, more than one thousand different products might be produced simultaneously in wafer fabrication facilities producing multiple product types like ASIC or power semiconductor. Besides, each product type has different process flow and product types and layers that can be processed together in each batch processing equipment are predetermined. Because of Such characteristics, estimating the flow time of each product is very difficult task.
In this study, we propose a method to predict the cycle time and assign the due date as accurately as possible even if the product mix varies continuously. For this, we group the products according to the similarity of process flow and use the information from the groups to predict the cycle time using artificial neural network. The experimental results show that the proposed method is superior to common due date assignment method. 
번호 category 학회 제목 author presenter year
95 IC  W-PIN  ISP vs. ISP+CDN: Can ISPs in Duopoly Profit by Introducing CDN Services? Dongmyung Lee    2012 
94 IC  SISE  Inventory Management System using 3D-Camera & Deep Learning file Chanho Hwang  Chanho Hwang  2016 
93 IC  SISE  Impact of Information Visibility of Quality and Physical Flow on the Closed-loop Supply Chain file Young-woo Kim  Young-woo Kim  2016 
92 IC  SICEAS  INTERACTIVE PLACEMENT METHOD FOR CONTAINER LOADING PROBLEM USING DEPTH CAMERA file Nasution Ninan  Nasution Ninan  2017 
91 IC  SeoulSim  Design for a Hybrid System of Integration Kanban with MRPII Taeyoung Song    2001 
90 IC  SCSC  Performance Improvement Methodology for a Manufacturing System using Petri Nets and Simulation Analysis Kichang Lee    2002 
89 IC  SCSC  Inventory Management in a Supply Chain using Neural Networks file Sungwon Jung    2002 
88 IC  SCSC  Performance Evaluation of Alternative Designs for the Car Recycling System Using Simulation Analysis file Eoksu Sim    2004 
87 IC  PLM  Designing Product Platform for Efficient Production Planning Process Hongbum Na    2008 
86 IC  PEDAC  A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness Daeyoung Chung    2001 
85 IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
84 IC  PCM  FMS Scheduling Strategies in a Distributed Coordination Environment Jonghun Park    1996 
83 IC  PAIS  Knowledge Acquisition using Neural Network and Simulator Kitae Shin    2001 
82 IC  MITIP  Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard Jinwu Seo    2011 
» IC  KGW  A study on due-date assignment method in wafer fabrication facility producing multiple product types file Jaewon Park    2005 
80 IC  JCIMT  Operational Performance metrics in manufacturing process: Based on SCOR model and RFID technology Gyusun Hwang    2014 
79 IC  IW on IMS  Maximally permissive adaptive control of an automated manufacturing cell Sangkyun Kim    1999 
78 IC  ISPIM  Open Innovation in SMEs - The Case of KICMS Sungjoo Lee    2008 
77 IC  ISII  Framework Design of Intelligent Service System for the Middle-of-Life Product Soyeon Yoon    2011 
76 IC  ISFA  A framework for the ubiquitous MES using RFID and Web services technology file Manchul Han    2006