149 | DC | 공동학회春 |
A Study on Hierarchical Approach for FMS Production Planning and Scheduling Problems
| Seongyoung Jang | | 1990 |
148 | DC | 공동학회春 |
Implementation of a Production Planning and Scheduling Module for Operations of a Flexible Manufacturing and Assembly System
| Chankwon Park | | 1992 |
147 | DC | 공동학회春 |
A Study on Development of a Knowledge Based Scheduler and Knowledge Acquisition through Simulation
| Kitae Kim | | 1994 |
146 | DC | 공동학회春 |
An Approximation Method for Job Shop Scheduling Problem with Sequence Independent Setup Time
| Hanil Jeong | | 1996 |
145 | DC | 공동학회春 |
A Study on the Group Scheduling Problem in Cellular Manufacturing System
| Jaesoo Shim | | 1995 |
144 | DC | 공동학회春 |
Development of a Shop-floor Scheduling and Control Software Based on Bidding Algorithm
| Daeyoung Chung | | 1995 |
143 | DC | 공동학회春 |
Design and Specification of Low-Level Control Softwares for FMC using Supervisory Control Theory
| Sangkyun Kim | | 1995 |
142 | DC | 공동학회春 |
A Study on Part Selection Problem at Initial Design Stage of FMS
| Hosub Shin | | 1996 |
141 | DC | 공동학회春 |
Function-to-Process Flow Model Transformation for Design of CIM
| Chankwon Park | | 1996 |
140 | DC | 공동학회春 |
철강산업에서 용선제조비용 최소화를 위한 최적화모형 개발
| Jonghan Kim | | 1997 |
139 | DC | 공동학회春 |
A scheduling algorithm considering subcontract cost in MRP environment
| Kichang Lee | | 1997 |
138 | DC | 공동학회春 |
생산시스템의 지식획득을 위한 Intelligent Simulator설계에 관한 연구
| Kitae Kim | | 1998 |
137 | DC | 공동학회春 |
Multiple Views를 지원하는 통합 BOM관리 시스템의 구조 설계
| Keumseok Kang | | 1998 |
136 | DC | 공동학회春 |
제조 셀의 의사결정지원을 위한 음성인식 시스템의 구현에 관한 연구
| Eoksu Sim | | 1999 |
135 | DC | 공동학회春 |
시뮬레이션을 이용한 Billet Yard의 물류 개선 방안에 관한 연구
| Jonghan Kim | | 1999 |
134 | DC | 공동학회春 |
생산계획 단계를 고려한 Job shop 환경에서 Order Release 정책의 유효성 관한 연구
| Byeongdae Choi | | 1999 |
133 | DC | 공동학회春 |
생산 용량을 고려한 사건 기반(Event-driven) MRP의 컴포넌트 개발에 관한 연구
| Seunghyun Yoon | | 1999 |
132 | DC | 공동학회春 |
MRP 생산 오더의 페깅 정보 만족과 납기 지연을 최소화하는 다수 기계 작업장들의 스케쥴링에 대한 연구
| Yangja Jang | | 1999 |
131 | DC | 공동학회春 |
생산능력 조정을 고려한 Job Shop 일정계획 문제에 관한 연구
| Daeyoung Chung | | 1999 |
130 | DC | 공동학회春 |
품질설계와 일정계획의 통합에 대한 연구
| Jonghan Kim | | 1999 |
129 | DC | 공동학회春 |
반복제조환경에서 생산용량과 셋업요소를 고려한 다단계 로트크기 결정 문제에 관한 연구
| Kichang Lee | | 1999 |
128 | DC | 공동학회春 |
MRP와 간반을 결합한 혼합시스템의 설계에 관한 연구
| Taeyoung Song | | 2000 |
127 | DC | 공동학회春 |
복합 포아송 수요를 갖는 2계층 분배형 공급사슬에서 공유 재고정보를 활용한 재주문 정책
| Yongwon S | | 2001 |
126 | DC | 공동학회春 |
셀 제조시스템 구현을 위한 의사결정지원에 관한 연구
| Muynghee Byun | | 2001 |
125 | DC | 공동학회春 |
유연한 수리계획 작성을 위한 모형관리자의 설계 및 구현
| Youngcheol Yang | | 2001 |
124 | DC | 공동학회春 |
주문비용 감축과 판촉에 대한 투자 의사결정에 대한 연구
| Jaehoon Seoung | | 2001 |
123 | DC | 공동학회春 |
Supply Chain 최적화 문제의 Model Management System의 설계 및 구현-생산 및 분배계획을 중심으로
| Youngcheol Yang | | 2002 |
122 | DC | 공동학회春 |
BSC와 DEA기법을 이용한 조직 성과 비교에 대한 연구
| Kitae Shin | | 2002 |
121 | DC | 공동학회春 |
QFD와 인공지능기법을 이용한 사출금형의 견적 지원 시스템
| Gunhee Kim | | 2003 |
120 | DC | 공동학회春 |
자동차부품의 재활용률 증대를 위한 역공급사슬에 관한 연구
| Haejoong Kim | | 2004 |
119 | DC | 공동학회春 |
역공급사슬환경에서의 제품 개발 방법론에 대한 연구
| Joon Kim | | 2005 |
118 | DC | 공동학회春 |
활동기준 원가를 고려한 확장 워크플로우모델
| Moontae Hwang | | 2005 |
117 | DJ | 공동학회春 |
재난 현장의 구호 자원 운송 차량 경로에 관한 연구
| 한수민 | 한수민 | 2016 |
116 | DC | 경영통합학회 |
Software Development Effort Estimation Considering Complexity Using Radial Basis Function Network
| Youngwoo Kim | | 2010 |
115 | DC | 경영통합학회 |
프로젝트 관리 방식에 근거한 SW 엔지니어링 계량 방식에 대한 연구
| Jinwu Seo | | 2013 |
114 | DC | 경영과학秋 |
BOM구조를 고려한 Job Shop 일정계획에 관한 연구
| Chiho Moon | | 2009 |
113 | DC | 경영과학秋 |
고장복구시간 예측기술의 스케줄링 활용 방안
| Jinwu Seo | | 2010 |
112 | DC | 경영과학秋 |
재해현장의 구호물류를 위한 분산계획 시스템에 대한 연구
| Sumin Han | | 2013 |
111 | DC | 경영과학秋 |
군용 항공기 일일 비행임무 계획을 위한 항공기 할당 문제
| Jun-Ho Park | | 2011 |
110 | DC | 경영과학秋 |
스마트 그리드 환경에서 제조기업의 에너지 효율화를 위한 스마트 생산 일정계획
| Joon Yung Moon | | 2011 |
109 | DC | 경영과학秋 |
SNU CIM-FMS Center : the first step for CIM
| Jintae Jang | | 1992 |
108 | DC | 경영과학秋 |
Deadlock Control in Flexible Manufacturing with a Distributed Control Scheme
| Namkyu Park | | 1993 |
107 | DC | 경영과학秋 |
A Comparative Analysis of Production Control Policies under Production Uncertainty
| Janghan Lee | | 1993 |
106 | DC | 경영과학秋 |
Distributed Control of Shop Floor for Flexible Manufacturing System
| Namkyu Park | | 1993 |
105 | DC | 경영과학秋 |
Development of Statistic data processing module for layout simulator
| Hosub Shin | | 1994 |
104 | DC | 경영과학秋 |
군집합 방법을 이용한 모듈라 자재명세서 생성
| Jonghan Kim | | 1997 |
103 | DC | 경영과학秋 |
유전 알고리즘을 이용한 생산 및 분배 계획
| Sungwon Jung | | 2001 |
102 | DC | 경영과학秋 |
LP-Relaxation과 유전 알고리즘을 이용한 공급사슬설계 문제
| Haejoong Kim | | 2002 |
101 | IC | W-PIN |
ISP vs. ISP+CDN: Can ISPs in Duopoly Profit by Introducing CDN Services?
| Dongmyung Lee | | 2012 |
100 | IC | SISE |
Inventory Management System using 3D-Camera & Deep Learning
| Chanho Hwang | Chanho Hwang | 2016 |
99 | IC | SISE |
Impact of Information Visibility of Quality and Physical Flow on the Closed-loop Supply Chain
| Young-woo Kim | Young-woo Kim | 2016 |
98 | IC | SICEAS |
INTERACTIVE PLACEMENT METHOD FOR CONTAINER LOADING PROBLEM USING DEPTH CAMERA
| Nasution Ninan | Nasution Ninan | 2017 |
97 | IC | SeoulSim |
Design for a Hybrid System of Integration Kanban with MRPII
| Taeyoung Song | | 2001 |
96 | IC | SCSC |
Performance Improvement Methodology for a Manufacturing System using Petri Nets and Simulation Analysis
| Kichang Lee | | 2002 |
95 | IC | SCSC |
Inventory Management in a Supply Chain using Neural Networks
| Sungwon Jung | | 2002 |
94 | IC | SCSC |
Performance Evaluation of Alternative Designs for the Car Recycling System Using Simulation Analysis
| Eoksu Sim | | 2004 |
93 | IC | PLM |
Designing Product Platform for Efficient Production Planning Process
| Hongbum Na | | 2008 |
92 | IC | PEDAC |
A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness
| Daeyoung Chung | | 2001 |
91 | IC | PCM |
An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment
| Hanil Jeong | | 1996 |
90 | IC | PCM |
FMS Scheduling Strategies in a Distributed Coordination Environment
| Jonghun Park | | 1996 |
89 | IC | PAIS |
Knowledge Acquisition using Neural Network and Simulator
| Kitae Shin | | 2001 |
88 | IC | MITIP |
Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard
| Jinwu Seo | | 2011 |
87 | DC | KSME |
재구성 생산 시스템을 위한 스케줄러 및 시뮬레이터 개발
| Sumin Han | | 2014 |
86 | DC | KOSHAM |
새로운 분류 알고리즘을 적용한 응급대응자원관리 시스템에 관한 연구
| Sumin Han | | 2014 |
85 | IC | KGW |
A study on due-date assignment method in wafer fabrication facility producing multiple product types
| Jaewon Park | | 2005 |
84 | IC | JCIMT |
Operational Performance metrics in manufacturing process: Based on SCOR model and RFID technology
| Gyusun Hwang | | 2014 |
83 | IC | IW on IMS |
Maximally permissive adaptive control of an automated manufacturing cell
| Sangkyun Kim | | 1999 |
82 | DC | IT서비스春 |
조선 프로젝트 계약 방식에 착안한 SW 프로젝트 계약 방식 제안
| Jinwu S | | 2013 |
81 | IC | ISPIM |
Open Innovation in SMEs - The Case of KICMS
| Sungjoo Lee | | 2008 |
80 | IC | ISII |
Framework Design of Intelligent Service System for the Middle-of-Life Product
| Soyeon Yoon | | 2011 |
79 | IC | ISFA |
A framework for the ubiquitous MES using RFID and Web services technology
| Manchul Han | | 2006 |
78 | IC | ISCM |
Integrated Models for Multi-level Planning and Scheduling in Supply Chain
| Haejoong Kim | | 2006 |
77 | IC | INFORMS-KORMS |
Hybrid Algorithms in Integrated Quality Design & Scheduling
| Jonghan Kim | | 2000 |
76 | IC | INFORMS-KORMS |
Development of capacitated event-driven MRP components using object oriented method
| Seunghyun Yoon | | 2000 |
75 | IC | INFORMS |
A Study on emergency logistics problem after massive natural disaster
| Sumin Han | Sumin Han | 2014 |
74 | IC | IJIE |
DEVELOPING GOOD QUALITY PERFORMANCE MEASURMENT MODEL TOWARD SMART FACTORY
| Gyusun Hwang | Gyusun Hwang | 2016 |
73 | IC | IIE |
Development of a Grid-Enabled MRP Process in RFID-Based APS
| Hyoung-Gon Lee | | 2007 |
72 | IC | IFORS |
A Closed-loop Supply Chain Coordination Model Considering the Effect of Regulation Alternatives
| Youngwoo Kim | | 2011 |
71 | IC | IFAC on IMS |
A Weighted Load Balancing Heuristic that Minimizes Makespan in Alternative Routing and Machine Environment
| Kidong Kim | | 1997 |
70 | IC | IEOM |
A Real-time Information System Using RFID for Visually Impaired
| Kyounghwi Tae | | 2011 |
69 | IC | IEOM |
Designing an effective scheduling scheme considering multi-level BOM in hybrid job shop
| Sumin Han | | 2012 |
68 | IC | IEOM |
Relieving electric power dependency during shortage with an on-site solar power supply
| CHOE SANG YUN | CHOE SANG YUN | 2015 |
67 | IC | ICUT |
A Framework for the Measurement of Supply Chain Performance in Ubiquitous Sensor Network
| Jaehyun Kong | | 2007 |
66 | IC | ICRA |
An On-Line Production Scheduler using Neural Network and Simulator based on Manufacturing System State
| Kitae Kim | | 2001 |
65 | IC | ICQT |
A Token Pricing Scheme for Internet Services
| Dongmyung Lee | | 2011 |
64 | IC | ICPR |
Business Process Modeling for developing a performance measurement system using the Internet of Things
| Gyusun Hwang | Jinwoo Park | 2015 |
63 | IC | ICPR |
A Study on FMS Scheduling Problems Based on Priority Functions Generated by Genetic Programming
| ChangUk Kim | | 1997 |
62 | IC | ICPR |
A Scheduling Algorithm considering Subcontract cost in MRP Environment
| Kichang Lee | | 1997 |
61 | IC | ICPR |
An Algrorithm for Job Shop Scheduling Problem with Due Date Constraints Considering Operation Subcontract
| Daeyoung Chung | | 2000 |
60 | IC | ICPR |
Development of a Decision Support System for the formulation of Manufacturing
| Kichang Lee | | 2001 |
59 | IC | ICPR |
Combined production and distribution planning using demand based mixed Genetic Algorithm in a supply chain
| Sungwon Jung | | 2003 |
58 | IC | ICPR |
A High Performance MRP Part Explosion Process using Computational Grid in a Distributed Database Environment
| Hyoung-Gon Lee | | 2007 |
57 | IC | ICPR |
A New Scheduling Paradigm Based on Farsighted Indices
| Hongbum Na | | 2009 |
56 | IC | ICPR |
A study on scheduling and rescheduling problem of the FMC during transient disturbance period with pallet constraints
| Hongbum Na | | 2011 |
55 | IC | ICPR |
The Effect of Enhanced Flexibility in the Reconfigurable Manufacturing Cell
| Jinwu S | | 2013 |
54 | IC | ICPR |
On-Site Safety Education in Factories Using Augmented Reality with Text Mining-based Marker
| Philjun Moon | Philjun Moon | 2017 |
53 | IC | ICOIN |
Analysis of Paris Metro Pricing for Wireless Internet Services
| Dongmyung Lee | | 2011 |
52 | IC | ICMA |
Machine-Understandable e-Business Modeling with Ontology
| Tai-Woo Chang | | 2002 |
51 | IC | ICLS |
Modeling and Optimization of Cost-effective Charging Scheduling for the Battery Switch Stations of Electric Vehicles
| Donghyun Kim | | 2012 |
» | IC | ICIMSA |
Internet of Things-Enabled Supply Chain Performance Measurement Model
| Abdallah J. Dweekat | Abdallah J. Dweekat | 2016 |