author Jinwu Seo 
2nd author  
presenter  
info This conference paper has been presented by Jinwoo Park on the International Conference on Modern Information Technology in the Innovation Processes of industrial enterprises. The conference has been held in Trondheim, Norway, 2011/6/22 ~ 2011/6/24 . 
year 2011 
category IC 
start / end date  
city / nation  
학회 MITIP 
keywords shipbuilding, project scheduling, real-time progress monitoring system, RFID 
abstract Shipbuilding consists of numerous activities but estimating activity time in shipbuilding, as a kind of project shop, is difficult and error-prone. Therefore monitoring the progress of activities and rescheduling the project based on progress information are very important for efficient follow up and keeping due dates of the projects. In our study, an automated real time progress monitoring system in block assembly shop using RFID is introduced. This system uses existing real-time location system as well as the technology to recognize the current statues of machines. To relate location and statues information with progress, the product production structure is used. Simulation study is also included to investigate the possible performance of the system with respect to various criteria. 

Download :

번호 category 학회 제목 author presenter year
35 IC  IEOM  A Real-time Information System Using RFID for Visually Impaired Kyounghwi Tae    2011 
34 IC  ICOIN  Analysis of Paris Metro Pricing for Wireless Internet Services Dongmyung Lee    2011 
33 IC  GameNets  Paris Metro Pricing for Internet Service Differentiation Dongmyung Lee    2011 
32 IC  ICQT  A Token Pricing Scheme for Internet Services Dongmyung Lee    2011 
» IC  MITIP  Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard Jinwu Seo    2011 
30 IC  IFORS  A Closed-loop Supply Chain Coordination Model Considering the Effect of Regulation Alternatives Youngwoo Kim    2011 
29 IC  ICPR  A study on scheduling and rescheduling problem of the FMC during transient disturbance period with pallet constraints Hongbum Na    2011 
28 IC  APMS  Modeling and optimization of unrelated parallel machine scheduling problem with time-dependent and machine-dependent electricity cost Joon Yung Moon    2011 
27 IC  AsiaSim  Developing a Practical Machine Scheduler for Worker-Involved Reconfigurable Manufacturing Systems Jinwu Seo    2011 
26 IC  ISII  Framework Design of Intelligent Service System for the Middle-of-Life Product Soyeon Yoon    2011 
25 IC  ICICIC  Evaluation of Intelligent Service System for the Middle-of-Life Product Soyeon Yoon    2011 
24 IC  ICLS  Modeling and Optimization of Cost-effective Charging Scheduling for the Battery Switch Stations of Electric Vehicles Donghyun Kim    2012 
23 IC  W-PIN  ISP vs. ISP+CDN: Can ISPs in Duopoly Profit by Introducing CDN Services? Dongmyung Lee    2012 
22 IC  APORS  Developing performance measurement framework for MES (Manufacturing Execution System) Gyusun Hwang    2012 
21 IC  IEOM  Designing an effective scheduling scheme considering multi-level BOM in hybrid job shop Sumin Han    2012 
20 IC  APMS  Designing an Integrated Data System for Remanufacturing with RFID Technology Youngwoo Kim    2012 
19 IC  APMS  Development of a Strategic Model for Freight Transportation with a Case Study of the Far East Louis Coulet    2013 
18 IC  ICPR  The Effect of Enhanced Flexibility in the Reconfigurable Manufacturing Cell Jinwu S    2013 
17 IC  JCIMT  Operational Performance metrics in manufacturing process: Based on SCOR model and RFID technology Gyusun Hwang    2014 
16 IC  APIEMS  A study on relieving electric power shortage by on-site solar power supply CHOE SANG YUN  CHOE SANG YUN  2014