author Jaewon Park 
2nd author / Hyoung-Gon Lee (Presenter) (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 2005년 03월 14일 ~ 2005년 03월 15일
City: Seoul
Nation: Korea
Additional Information: 
year 2005 
category IC 
start / end date  
city / nation  
학회 KGW 
keywords wafer fabrication, due-date assignment, neural network 
abstract Assigning due date and delivering timely are an important factor determining the competitive strength of a manufacturing company. Once an order received, we should check the inventory status before anything else. If the stock runs short, we should make the product. In this case, predicting the cycle time of the product is important for the due date assignment.
Due to the complicated process flow of wafer fabrication, distinctive approaches that differ from common scheduling method are required. Especially, more than one thousand different products might be produced simultaneously in wafer fabrication facilities producing multiple product types like ASIC or power semiconductor. Besides, each product type has different process flow and product types and layers that can be processed together in each batch processing equipment are predetermined. Because of Such characteristics, estimating the flow time of each product is very difficult task.
In this study, we propose a method to predict the cycle time and assign the due date as accurately as possible even if the product mix varies continuously. For this, we group the products according to the similarity of process flow and use the information from the groups to predict the cycle time using artificial neural network. The experimental results show that the proposed method is superior to common due date assignment method. 
번호 category 학회 제목 author presenter year
15 IC  APMS  A Lifecycle Data Management System Based on RFID Technology of EPCC1G2 Youngwoo Kim    2014 
14 IC  IEOM  Relieving electric power dependency during shortage with an on-site solar power supply CHOE SANG YUN  CHOE SANG YUN  2015 
13 IC  EURO  Multiperiod Hybrid Manufacturing/Remanufacturing Planning Under the Internet-of-Things Scenario file Young-woo Kim  Young-woo Kim  2015 
12 IC  APMS  Korea Smart Factory Program - Keynote Jinwoo Park  Jinwoo Park  2015 
11 IC  AsiaSim  A Study on Simulation Model for Yard Layout Planning in Offshore Plant Industry file Kim Hyun Jun  Kim Hyun Jun  2015 
10 IC  ICAT  A study on RFID user memory applications for production management and scheduling file Kyoungmin Kim  Kyoungmin Kim  2015 
9 IC  APORS  A study on makeshift recovery planning in emergency logistics considering disaster scene's risks and uncertainties file Sumin Han  Sumin Han  2015 
8 IC  FAIM 2016  A Study on the Distributed Vehicle Routing Problem of emergency vehicle fleet in the Disaster Scene file Sumin Han  Sumin Han  2016 
7 IC  ICPR  On-Site Safety Education in Factories Using Augmented Reality with Text Mining-based Marker file Philjun Moon  Philjun Moon  2017 
6 IC  IJIE  DEVELOPING GOOD QUALITY PERFORMANCE MEASURMENT MODEL TOWARD SMART FACTORY Gyusun Hwang  Gyusun Hwang  2016 
5 IC  SISE  Inventory Management System using 3D-Camera & Deep Learning file Chanho Hwang  Chanho Hwang  2016 
4 IC  SISE  Impact of Information Visibility of Quality and Physical Flow on the Closed-loop Supply Chain file Young-woo Kim  Young-woo Kim  2016 
3 IC  SICEAS  INTERACTIVE PLACEMENT METHOD FOR CONTAINER LOADING PROBLEM USING DEPTH CAMERA file Nasution Ninan  Nasution Ninan  2017 
2 IC  ICDMCE  Study on smart disaster recovery system using Internet of Things file Sumin Han  Gyusun Hwang  2016 
1 IC  INFORMS  A Study on emergency logistics problem after massive natural disaster Sumin Han  Sumin Han  2014