95 | IC | CIE |
A batch splitting heuristic for dynamic job shop scheduling problem
| Hanil Jeong | | 1996 |
94 | IC | CIE |
A decision support model for the initial design of FMS
| Hosub Shin | | 1996 |
93 | IC | ICARCV |
A Discrete Control Approach to Robotic Cell Operating System Design
| Jonghun Park | | 1996 |
92 | IC | PCM |
An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment
| Hanil Jeong | | 1996 |
91 | IC | PCM |
FMS Scheduling Strategies in a Distributed Coordination Environment
| Jonghun Park | | 1996 |
90 | IC | ICPR |
A Study on FMS Scheduling Problems Based on Priority Functions Generated by Genetic Programming
| ChangUk Kim | | 1997 |
89 | IC | ICPR |
A Scheduling Algorithm considering Subcontract cost in MRP Environment
| Kichang Lee | | 1997 |
88 | IC | IFAC on IMS |
A Weighted Load Balancing Heuristic that Minimizes Makespan in Alternative Routing and Machine Environment
| Kidong Kim | | 1997 |
87 | IC | APIEMS |
An Integrated Approach for Loading and Scheduling of a Flexible Manufactureing System
| Sangbok Woo | | 1999 |
86 | IC | APIEMS |
A Study on Developing a Scheduling System in Alternative Routing and Machine Environment
| Kidong Kim | | 1999 |
» | IC | IW on IMS |
Maximally permissive adaptive control of an automated manufacturing cell
| Sangkyun Kim | | 1999 |
84 | IC | ICPR |
An Algrorithm for Job Shop Scheduling Problem with Due Date Constraints Considering Operation Subcontract
| Daeyoung Chung | | 2000 |
83 | IC | INFORMS-KORMS |
Hybrid Algorithms in Integrated Quality Design & Scheduling
| Jonghan Kim | | 2000 |
82 | IC | INFORMS-KORMS |
Development of capacitated event-driven MRP components using object oriented method
| Seunghyun Yoon | | 2000 |
81 | IC | PAIS |
Knowledge Acquisition using Neural Network and Simulator
| Kitae Shin | | 2001 |
80 | IC | SeoulSim |
Design for a Hybrid System of Integration Kanban with MRPII
| Taeyoung Song | | 2001 |
79 | IC | GECCO |
A Study on the Resource Allocation Planning for Automated Container Terminals
| Yangja Jang | | 2001 |
78 | IC | ICPR |
Development of a Decision Support System for the formulation of Manufacturing
| Kichang Lee | | 2001 |
77 | IC | ICRA |
An On-Line Production Scheduler using Neural Network and Simulator based on Manufacturing System State
| Kitae Kim | | 2001 |
76 | IC | PEDAC |
A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness
| Daeyoung Chung | | 2001 |