author Gyusun Hwang 
2nd author Jinwoo Park 
presenter Jinwoo Park 
info  
year 2015 
category IC 
start / end date 2015-08-02 ~ 2015-08-06 
city / nation 마닐라/필리핀 
학회 ICPR 
keywords Business Process Modeling; Internet of Things; Performance measurement 
abstract The concept of Internet of Things (IoT) is important in collecting the shop floor data and transmitting it into the Information System in real time. The rapid proliferation of IoT in recent days has given rise to demands for clear definition among metrics as important sources of the performance measurement. This requirement comes from the various usage of IoT data: One raw IoT data is able to produce many metrics. In order to understand it, we need to consider the usage points of IoT data at different management levels. And by composing company management levels: Strategic level, Tactical level and Operational levels, we are able to analysis usage of IoT data among management levels.
The purpose of this study is to present the work flow of the performance measurement process with regard to monitoring the IoT outcomes. Also, we try to explore the core issues with Business Process Modelling and simulation. As a result of study, we expect that how IoT data is processed and which level needs an IoT data as a performance metrics.
We use BPM as a description of activities that constitute a performance measurement. Those are described in a graphical way using some components: Agent, Resources, Process, flow logic, and etc.The identification and discussion of result of BPM reflects how IoT data is handled and make a clear distinction of metrics usage among management levels. 
번호 category 학회 제목 author presenter year
95 IC  CIE  A batch splitting heuristic for dynamic job shop scheduling problem Hanil Jeong    1996 
94 IC  CIE  A decision support model for the initial design of FMS Hosub Shin    1996 
93 IC  ICARCV  A Discrete Control Approach to Robotic Cell Operating System Design Jonghun Park    1996 
92 IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
91 IC  PCM  FMS Scheduling Strategies in a Distributed Coordination Environment Jonghun Park    1996 
90 IC  ICPR  A Study on FMS Scheduling Problems Based on Priority Functions Generated by Genetic Programming ChangUk Kim    1997 
89 IC  ICPR  A Scheduling Algorithm considering Subcontract cost in MRP Environment Kichang Lee    1997 
88 IC  IFAC on IMS  A Weighted Load Balancing Heuristic that Minimizes Makespan in Alternative Routing and Machine Environment Kidong Kim    1997 
87 IC  APIEMS  An Integrated Approach for Loading and Scheduling of a Flexible Manufactureing System Sangbok Woo    1999 
86 IC  APIEMS  A Study on Developing a Scheduling System in Alternative Routing and Machine Environment Kidong Kim    1999 
85 IC  IW on IMS  Maximally permissive adaptive control of an automated manufacturing cell Sangkyun Kim    1999 
84 IC  ICPR  An Algrorithm for Job Shop Scheduling Problem with Due Date Constraints Considering Operation Subcontract Daeyoung Chung    2000 
83 IC  INFORMS-KORMS  Hybrid Algorithms in Integrated Quality Design & Scheduling Jonghan Kim    2000 
82 IC  INFORMS-KORMS  Development of capacitated event-driven MRP components using object oriented method Seunghyun Yoon    2000 
81 IC  PAIS  Knowledge Acquisition using Neural Network and Simulator Kitae Shin    2001 
80 IC  SeoulSim  Design for a Hybrid System of Integration Kanban with MRPII Taeyoung Song    2001 
79 IC  GECCO  A Study on the Resource Allocation Planning for Automated Container Terminals Yangja Jang    2001 
78 IC  ICPR  Development of a Decision Support System for the formulation of Manufacturing Kichang Lee    2001 
77 IC  ICRA  An On-Line Production Scheduler using Neural Network and Simulator based on Manufacturing System State file Kitae Kim    2001 
76 IC  PEDAC  A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness Daeyoung Chung    2001