75 | IC | PCM |
An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment
| Hanil Jeong | | 1996 |
74 | IC | PCM |
FMS Scheduling Strategies in a Distributed Coordination Environment
| Jonghun Park | | 1996 |
73 | IC | ICPR |
A Study on FMS Scheduling Problems Based on Priority Functions Generated by Genetic Programming
| ChangUk Kim | | 1997 |
72 | IC | ICPR |
A Scheduling Algorithm considering Subcontract cost in MRP Environment
| Kichang Lee | | 1997 |
71 | IC | IFAC on IMS |
A Weighted Load Balancing Heuristic that Minimizes Makespan in Alternative Routing and Machine Environment
| Kidong Kim | | 1997 |
70 | IC | APIEMS |
An Integrated Approach for Loading and Scheduling of a Flexible Manufactureing System
| Sangbok Woo | | 1999 |
69 | IC | APIEMS |
A Study on Developing a Scheduling System in Alternative Routing and Machine Environment
| Kidong Kim | | 1999 |
68 | IC | IW on IMS |
Maximally permissive adaptive control of an automated manufacturing cell
| Sangkyun Kim | | 1999 |
67 | IC | ICPR |
An Algrorithm for Job Shop Scheduling Problem with Due Date Constraints Considering Operation Subcontract
| Daeyoung Chung | | 2000 |
66 | IC | INFORMS-KORMS |
Hybrid Algorithms in Integrated Quality Design & Scheduling
| Jonghan Kim | | 2000 |
65 | IC | INFORMS-KORMS |
Development of capacitated event-driven MRP components using object oriented method
| Seunghyun Yoon | | 2000 |
64 | IC | PAIS |
Knowledge Acquisition using Neural Network and Simulator
| Kitae Shin | | 2001 |
» | IC | SeoulSim |
Design for a Hybrid System of Integration Kanban with MRPII
| Taeyoung Song | | 2001 |
62 | IC | GECCO |
A Study on the Resource Allocation Planning for Automated Container Terminals
| Yangja Jang | | 2001 |
61 | IC | ICPR |
Development of a Decision Support System for the formulation of Manufacturing
| Kichang Lee | | 2001 |
60 | IC | ICRA |
An On-Line Production Scheduler using Neural Network and Simulator based on Manufacturing System State
| Kitae Kim | | 2001 |
59 | IC | PEDAC |
A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness
| Daeyoung Chung | | 2001 |
58 | IC | ICMA |
Machine-Understandable e-Business Modeling with Ontology
| Tai-Woo Chang | | 2002 |
57 | IC | Asian eBiz |
A Systematic Approach for Ontology-based e-Business Modeling
| Tai-Woo Chang | | 2002 |
56 | IC | SCSC |
Performance Improvement Methodology for a Manufacturing System using Petri Nets and Simulation Analysis
| Kichang Lee | | 2002 |