author Kidong Kim 
2nd author / Hyungsang Hahn ()
/ Chankwon Park (Dept. of Industrial Engineering, Seoul National University)
/ Namkyu Park (Dept. of Industrial Engineering, Seoul National University)
/ Youngsoo Lee ()
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 1997년 07월 21일 ~ 1997년 07월 23일
City: Seoul
Nation: Korea
Additional Information:
4th IFAC Workshop on Intelligent Manufactuing Systems, pp95-100 
year 1997 
category IC 
start / end date  
city / nation  
학회 IFAC on IMS 
keywords Scheduling, Process Planning, Simulation 
abstract Traditionally, the problems of manufacturing technology and manufacturing management have been treated independently. The process planning problem and the scheduling problem are a good example. In this research, we propose a scheduling system which solves the process planninng problem and the scheduling problem simultaneously. We argue that we can obtain a better and practical scheduling solution by dynamically changing the processing machines and operations as the shop condition changes. The proposed scheduling system takes the initial process plan for alternative machines and operations represented by an AND/OR graph as its input. Other informational inputs to the system are part order and shop status. The system then generates new process plans and schedules iteratively, until we finally fix the process plan after verifying the performance of the schedule by a simulation study. Experimental results show that the proposed scheme provides a viable solution for real world scheduling problems. 

Download:

번호 category 학회 제목 author presenter year
55 IC  SCSC  Inventory Management in a Supply Chain using Neural Networks file Sungwon Jung    2002 
54 IC  IBERC  An Ontology-Based Framework for e-Business Integration file Tai-Woo Chang    2003 
53 IC  ICPR  Combined production and distribution planning using demand based mixed Genetic Algorithm in a supply chain file Sungwon Jung    2003 
52 IC  CIE  Decision support system for preliminary cost estimation with case based reasoning file Jonghan Kim    2004 
51 IC  SCSC  Performance Evaluation of Alternative Designs for the Car Recycling System Using Simulation Analysis file Eoksu Sim    2004 
50 IC  GECCO  A Generic Network Design for a Closed-loop Supply Chain Using Genetic Algorithm file Eoksu Sim    2004 
49 IC  AsiaSim  Vendor Managed Inventory and its value in the various supply chain Sungwon Jung    2004 
48 IC  AsiaSim  Performance Analysis of Alternative Designs for a Vehicle Disassembly System using Simulation Modeling file Eoksu Sim    2004 
47 IC  AsiaSim  Reorder decision system based on the concept of the order risk using neural networks Sungwon Jung    2004 
46 IC  CIE  Information Strategy Planning for the Korean Postal Address Database file Tai-Woo Chang    2004 
45 IC  e-Biz  Design of Information System for e-Logistics Kitae Shin    2004 
44 IC  ICCSA  Efficient Mapping Rule of IDEF for UMM Application file Kitae Shin    2005 
43 IC  KGW  A study on due-date assignment method in wafer fabrication facility producing multiple product types file Jaewon Park    2005 
42 IC  Asian eBiz  Applying Negotiation Patterns in Supply Chain Planning based on Self-integrating Environment file Yuncheol Kang    2005 
41 IC  GECCO  Solving Multi-level Lot Sizing Problem with Memetic Algorithm based on Refinement Procedure file Haejoong Kim    2006 
40 IC  ISFA  A framework for the ubiquitous MES using RFID and Web services technology file Manchul Han    2006 
39 IC  APMS  A new Approach for finite Capacity Planning in MRP Environment Hongbum Na    2006``` 
38 IC  AsiaSim  The Cost Valuation Model for Reverse Supply Chain Using System Dynamics Hyunjong Jeong    2006 
37 IC  ISCM  Integrated Models for Multi-level Planning and Scheduling in Supply Chain Haejoong Kim    2006 
36 IC  IIE  Development of a Grid-Enabled MRP Process in RFID-Based APS Hyoung-Gon Lee    2007