author Jaewon Park 
2nd author / Hyoung-Gon Lee (Presenter) (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 2005년 03월 14일 ~ 2005년 03월 15일
City: Seoul
Nation: Korea
Additional Information: 
year 2005 
category IC 
start / end date  
city / nation  
학회 KGW 
keywords wafer fabrication, due-date assignment, neural network 
abstract Assigning due date and delivering timely are an important factor determining the competitive strength of a manufacturing company. Once an order received, we should check the inventory status before anything else. If the stock runs short, we should make the product. In this case, predicting the cycle time of the product is important for the due date assignment.
Due to the complicated process flow of wafer fabrication, distinctive approaches that differ from common scheduling method are required. Especially, more than one thousand different products might be produced simultaneously in wafer fabrication facilities producing multiple product types like ASIC or power semiconductor. Besides, each product type has different process flow and product types and layers that can be processed together in each batch processing equipment are predetermined. Because of Such characteristics, estimating the flow time of each product is very difficult task.
In this study, we propose a method to predict the cycle time and assign the due date as accurately as possible even if the product mix varies continuously. For this, we group the products according to the similarity of process flow and use the information from the groups to predict the cycle time using artificial neural network. The experimental results show that the proposed method is superior to common due date assignment method. 
번호 category 학회 제목 author presenter year
15 IC  IFORS  A Closed-loop Supply Chain Coordination Model Considering the Effect of Regulation Alternatives Youngwoo Kim    2011 
14 IC  ICPR  A study on scheduling and rescheduling problem of the FMC during transient disturbance period with pallet constraints Hongbum Na    2011 
13 IC  APMS  Modeling and optimization of unrelated parallel machine scheduling problem with time-dependent and machine-dependent electricity cost Joon Yung Moon    2011 
12 IC  AsiaSim  Developing a Practical Machine Scheduler for Worker-Involved Reconfigurable Manufacturing Systems Jinwu Seo    2011 
11 IC  ISII  Framework Design of Intelligent Service System for the Middle-of-Life Product Soyeon Yoon    2011 
10 IC  ICICIC  Evaluation of Intelligent Service System for the Middle-of-Life Product Soyeon Yoon    2011 
9 IC  ICLS  Modeling and Optimization of Cost-effective Charging Scheduling for the Battery Switch Stations of Electric Vehicles Donghyun Kim    2012 
8 IC  W-PIN  ISP vs. ISP+CDN: Can ISPs in Duopoly Profit by Introducing CDN Services? Dongmyung Lee    2012 
7 IC  APORS  Developing performance measurement framework for MES (Manufacturing Execution System) Gyusun Hwang    2012 
6 IC  IEOM  Designing an effective scheduling scheme considering multi-level BOM in hybrid job shop Sumin Han    2012 
5 IC  APMS  Designing an Integrated Data System for Remanufacturing with RFID Technology Youngwoo Kim    2012 
4 IC  APMS  Development of a Strategic Model for Freight Transportation with a Case Study of the Far East Louis Coulet    2013 
3 IC  ICPR  The Effect of Enhanced Flexibility in the Reconfigurable Manufacturing Cell Jinwu S    2013 
2 IC  JCIMT  Operational Performance metrics in manufacturing process: Based on SCOR model and RFID technology Gyusun Hwang    2014 
1 IC  APMS  A Lifecycle Data Management System Based on RFID Technology of EPCC1G2 Youngwoo Kim    2014