author Kichang Lee 
2nd author / Kitae Kim (Dept. of Industrial Engineering, Seoul National University)
/ Kitae Shin (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 1997년 08월 04일 ~ 1997년 08월 05일
City: Osaka
Nation: Japan
Additional Information:
The 14th International Conference on Production Research, pp.1068-1071. 
year 1997 
category IC 
start / end date  
city / nation  
학회 ICPR 
keywords Scheduling, Due Date, Subcontract Cost, Heuristic 
abstract Customer satisfaction is becoming more and more important issue in enterprise environments these days. And meeting due-dates may be one of the most critical necessary conditions in satisfying customer needs. In this respect, many researchers have tried to develop good scheduling algorithms to observe due-dates. Most of these efforts tried to minimize some tardiness related measures by assigning heavy penalty costs when due-dates are violated while considering fixed production capacities. A more practical approach to circumvent the problem may be to use subcontracting mechanism. The production environment of this research may be considered as a flexible flow line. And the objective function of the problem is to minimize the subcontract cost while observing due-date and focusing on the possibilities of subcontracting. The solution methodology adopted in this research is an effective heuristic algorithm based on backward schedule generation and forward search & modification method. The experimental results of this heuristic were shown to be very fast and efficient and in many cases were same with optimal solution.. 

Download:

번호 category 학회 제목 author presenter year
15 IC  ICPR  Business Process Modeling for developing a performance measurement system using the Internet of Things file Gyusun Hwang  Jinwoo Park  2015 
14 IC  IEOM  Relieving electric power dependency during shortage with an on-site solar power supply CHOE SANG YUN  CHOE SANG YUN  2015 
13 IC  EURO  Multiperiod Hybrid Manufacturing/Remanufacturing Planning Under the Internet-of-Things Scenario file Young-woo Kim  Young-woo Kim  2015 
12 IC  APMS  Korea Smart Factory Program - Keynote Jinwoo Park  Jinwoo Park  2015 
11 IC  AsiaSim  A Study on Simulation Model for Yard Layout Planning in Offshore Plant Industry file Kim Hyun Jun  Kim Hyun Jun  2015 
10 IC  ICAT  A study on RFID user memory applications for production management and scheduling file Kyoungmin Kim  Kyoungmin Kim  2015 
9 IC  APORS  A study on makeshift recovery planning in emergency logistics considering disaster scene's risks and uncertainties file Sumin Han  Sumin Han  2015 
8 IC  ICIMSA  Internet of Things-Enabled Supply Chain Performance Measurement Model file Abdallah J. Dweekat  Abdallah J. Dweekat  2016 
7 IC  FAIM 2016  A Study on the Distributed Vehicle Routing Problem of emergency vehicle fleet in the Disaster Scene file Sumin Han  Sumin Han  2016 
6 IC  IJIE  DEVELOPING GOOD QUALITY PERFORMANCE MEASURMENT MODEL TOWARD SMART FACTORY Gyusun Hwang  Gyusun Hwang  2016 
5 IC  SISE  Inventory Management System using 3D-Camera & Deep Learning file Chanho Hwang  Chanho Hwang  2016 
4 IC  SISE  Impact of Information Visibility of Quality and Physical Flow on the Closed-loop Supply Chain file Young-woo Kim  Young-woo Kim  2016 
3 IC  ICDMCE  Study on smart disaster recovery system using Internet of Things file Sumin Han  Gyusun Hwang  2016 
2 IC  ICPR  On-Site Safety Education in Factories Using Augmented Reality with Text Mining-based Marker file Philjun Moon  Philjun Moon  2017 
1 IC  SICEAS  INTERACTIVE PLACEMENT METHOD FOR CONTAINER LOADING PROBLEM USING DEPTH CAMERA file Nasution Ninan  Nasution Ninan  2017