author Gyusun Hwang 
2nd author Jinwoo Park 
presenter Jinwoo Park 
info  
year 2015 
category IC 
start / end date 2015-08-02 ~ 2015-08-06 
city / nation 마닐라/필리핀 
학회 ICPR 
keywords Business Process Modeling; Internet of Things; Performance measurement 
abstract The concept of Internet of Things (IoT) is important in collecting the shop floor data and transmitting it into the Information System in real time. The rapid proliferation of IoT in recent days has given rise to demands for clear definition among metrics as important sources of the performance measurement. This requirement comes from the various usage of IoT data: One raw IoT data is able to produce many metrics. In order to understand it, we need to consider the usage points of IoT data at different management levels. And by composing company management levels: Strategic level, Tactical level and Operational levels, we are able to analysis usage of IoT data among management levels.
The purpose of this study is to present the work flow of the performance measurement process with regard to monitoring the IoT outcomes. Also, we try to explore the core issues with Business Process Modelling and simulation. As a result of study, we expect that how IoT data is processed and which level needs an IoT data as a performance metrics.
We use BPM as a description of activities that constitute a performance measurement. Those are described in a graphical way using some components: Agent, Resources, Process, flow logic, and etc.The identification and discussion of result of BPM reflects how IoT data is handled and make a clear distinction of metrics usage among management levels. 
번호 category 학회 제목 author presenter year
75 IC  ICPR  The Effect of Enhanced Flexibility in the Reconfigurable Manufacturing Cell Jinwu S    2013 
74 IC  ICLS  Modeling and Optimization of Cost-effective Charging Scheduling for the Battery Switch Stations of Electric Vehicles Donghyun Kim    2012 
73 IC  W-PIN  ISP vs. ISP+CDN: Can ISPs in Duopoly Profit by Introducing CDN Services? Dongmyung Lee    2012 
72 IC  APORS  Developing performance measurement framework for MES (Manufacturing Execution System) Gyusun Hwang    2012 
71 IC  IEOM  Designing an effective scheduling scheme considering multi-level BOM in hybrid job shop Sumin Han    2012 
70 IC  APMS  Designing an Integrated Data System for Remanufacturing with RFID Technology Youngwoo Kim    2012 
69 IC  IEOM  A Real-time Information System Using RFID for Visually Impaired Kyounghwi Tae    2011 
68 IC  ICOIN  Analysis of Paris Metro Pricing for Wireless Internet Services Dongmyung Lee    2011 
67 IC  GameNets  Paris Metro Pricing for Internet Service Differentiation Dongmyung Lee    2011 
66 IC  ICQT  A Token Pricing Scheme for Internet Services Dongmyung Lee    2011 
65 IC  MITIP  Real-time Progress Monitoring System: Application In Block Assembly Shop In Shipyard Jinwu Seo    2011 
64 IC  IFORS  A Closed-loop Supply Chain Coordination Model Considering the Effect of Regulation Alternatives Youngwoo Kim    2011 
63 IC  ICPR  A study on scheduling and rescheduling problem of the FMC during transient disturbance period with pallet constraints Hongbum Na    2011 
62 IC  APMS  Modeling and optimization of unrelated parallel machine scheduling problem with time-dependent and machine-dependent electricity cost Joon Yung Moon    2011 
61 IC  AsiaSim  Developing a Practical Machine Scheduler for Worker-Involved Reconfigurable Manufacturing Systems Jinwu Seo    2011 
60 IC  ISII  Framework Design of Intelligent Service System for the Middle-of-Life Product Soyeon Yoon    2011 
59 IC  ICICIC  Evaluation of Intelligent Service System for the Middle-of-Life Product Soyeon Yoon    2011 
58 IC  APMS  Supply Chain Planning in Open Business Environment based on Business Patterns Hanil Jeong    2010 
57 IC  ICPR  A New Scheduling Paradigm Based on Farsighted Indices Hongbum Na    2009 
56 IC  APMS  A Framework for Enhancing Responsiveness in Sales Order Processing System Using Web Services and Ubiquitous Computing Technologies Mokmin Park    2009