author Hongbum Na 
2nd author  
presenter  
info This conference paper has been presented by Hongbum Na on the International Conference on Production Research. The conference has been held in Stuttgart, Germany, 2011/7/31 ~ 2011/8/4 . 
year 2011 
category IC 
start / end date  
city / nation  
학회 ICPR 
keywords FMC scheduling, pallet constraints, transient disturbance, rescheduling method 
abstract When trying to solve a flexible manufacturing cell (FMC) scheduling problem in certain types of industrial situation, not only the routing and sequencing problems but also the availability of pallets and loading/unloading (L/U) stations could be considered. In those situations, scheduling problems are constrained by the number of pallets, pallet operation policies and L/U station conditions because each job requires a setup with different types of pallets, which are performed at L/U stations.
In this study, overall scheduling process and several heuristic algorithms based on priority rules which utilize the information of pallets and L/U stations are introduced to generate good production schedules. The makespans of the machining centers and L/U stations are considered in a hierarchical manner. Considering practical shop environments, several types of transient disturbances such as preventive maintenance and machine breakdown are considered and several rescheduling methods are suggested 

Download :

번호 category 학회 제목 author presenter year
35 IC  Asian eBiz  Applying Negotiation Patterns in Supply Chain Planning based on Self-integrating Environment file Yuncheol Kang    2005 
34 IC  CIE  Decision support system for preliminary cost estimation with case based reasoning file Jonghan Kim    2004 
33 IC  SCSC  Performance Evaluation of Alternative Designs for the Car Recycling System Using Simulation Analysis file Eoksu Sim    2004 
32 IC  GECCO  A Generic Network Design for a Closed-loop Supply Chain Using Genetic Algorithm file Eoksu Sim    2004 
31 IC  AsiaSim  Vendor Managed Inventory and its value in the various supply chain Sungwon Jung    2004 
30 IC  AsiaSim  Performance Analysis of Alternative Designs for a Vehicle Disassembly System using Simulation Modeling file Eoksu Sim    2004 
29 IC  AsiaSim  Reorder decision system based on the concept of the order risk using neural networks Sungwon Jung    2004 
28 IC  CIE  Information Strategy Planning for the Korean Postal Address Database file Tai-Woo Chang    2004 
27 IC  e-Biz  Design of Information System for e-Logistics Kitae Shin    2004 
26 IC  IBERC  An Ontology-Based Framework for e-Business Integration file Tai-Woo Chang    2003 
25 IC  ICPR  Combined production and distribution planning using demand based mixed Genetic Algorithm in a supply chain file Sungwon Jung    2003 
24 IC  ICMA  Machine-Understandable e-Business Modeling with Ontology Tai-Woo Chang    2002 
23 IC  Asian eBiz  A Systematic Approach for Ontology-based e-Business Modeling Tai-Woo Chang    2002 
22 IC  SCSC  Performance Improvement Methodology for a Manufacturing System using Petri Nets and Simulation Analysis Kichang Lee    2002 
21 IC  SCSC  Inventory Management in a Supply Chain using Neural Networks file Sungwon Jung    2002 
20 IC  PAIS  Knowledge Acquisition using Neural Network and Simulator Kitae Shin    2001 
19 IC  SeoulSim  Design for a Hybrid System of Integration Kanban with MRPII Taeyoung Song    2001 
18 IC  GECCO  A Study on the Resource Allocation Planning for Automated Container Terminals Yangja Jang    2001 
17 IC  ICPR  Development of a Decision Support System for the formulation of Manufacturing Kichang Lee    2001 
16 IC  ICRA  An On-Line Production Scheduler using Neural Network and Simulator based on Manufacturing System State file Kitae Kim    2001