author Kim Hyun Jun 
2nd author Jinwoo Park
Sunghoon Kim
Sang Hyup Lee
Seung Jin Ha 
presenter Kim Hyun Jun 
info This conference paper has been presented by Kim Hyun Jun the Asia-Simulation Conference. The conference has been held in Jeju, Korea, Republic of, 2015/11/04 ~ 2014/11/07 . 
year 2015 
category IC 
start / end date 2015-11-04 ~ 2015-11-07 
city / nation Jeju / Korea 
학회 AsiaSim 
keywords Lay-out Planning, Priority Policy, Dynamic Programming, Simulation 
abstract Though numerous studies have dealt the lay-out planning methods for shipbuilding industry, in practice the lay-out planning is still done by people under the rule of thumb. It seems illogical to treat such key resource without any scientific management, however matters such as reliability, frequent modifications, and lack of data makes it hard to adapt an automated method in such spatial planning.
To investigate on this problem this paper examines a heavy industry company in Korea and executes a simulation study. The targeted company produces numerous types of offshore plants which all follows varying production processes. So it is told that there exists some special difficulties in predicting and managing newly given constructions. Also another characteristic that makes managing such work difficult is that there exists frequent change requests to design process, quantity, and schedule.
Like many other competitive companies, company H still relies solely on human resource to plan the lay-outs without using any automated systems. This could cause problems such as long hours spent in planning/evaluating the lay-out plan and the difficulty in attaining a substitute for such planning jobs. This is because the current lay-out planning process depends heavily on the experiences of the planner. The difficulty of training a worker to become such specialist is one thing, but to find a substitute in the case of emergency is a more serious problem.
To solve this problem this paper suggests a practical algorithm that can deploy the blocks under a short given time. The system would automatically prioritize the blocks that needs to be placed on the yards and find a location that could maximize the yard utilization and minimize the delays on the site. However because of the uncertainties in the field, such as assembly modifications, contract date delays, and variations in the processing time, it is extremely difficult to find an optimal solution in such short given time.
Studies done by Li(2005) have divided the lay-out process into two separate steps, prescheduling and spatial planning. Here the second step utilized the genetic algorithm. Other researches such as Raj(2007) treated this problem as a 3D bin packing problem, while Zheng(2011) approached this matter using greedy algorithm to minimize the makespan. However none of the previous works considered the uncertainties that exits on the spatial planning process.
So to aid the suggested problem this simulation study aims to find a priority rule to deploy the blocks while considering the uncertainties. Measures such as block size, delayed time of the selected block, and so on would be examined through simulation to find the best performing weights for such variables. Blocks will be prioritized under this rule and will be placed on the yards using the suggested algorithm.
A typical process of such simulation would go through following steps. The first step would be deciding the timeline of deployment. After selecting the timeline target project will be selected. The term project used here is a group of modules and blocks that needs to be placed on the yard. The next step would be choosing the weights for the priority rule. Measures such as delayed time, deployment time, and the size of the block would be considered. By simulating the model while varying the weights of such measures, we will be able to suggest the best performing block selecting policy rule for the spatial lay-out planning. 
번호 category 학회 제목 author presenter year
35 IC  Asian eBiz  Applying Negotiation Patterns in Supply Chain Planning based on Self-integrating Environment file Yuncheol Kang    2005 
34 IC  CIE  Decision support system for preliminary cost estimation with case based reasoning file Jonghan Kim    2004 
33 IC  SCSC  Performance Evaluation of Alternative Designs for the Car Recycling System Using Simulation Analysis file Eoksu Sim    2004 
32 IC  GECCO  A Generic Network Design for a Closed-loop Supply Chain Using Genetic Algorithm file Eoksu Sim    2004 
31 IC  AsiaSim  Vendor Managed Inventory and its value in the various supply chain Sungwon Jung    2004 
30 IC  AsiaSim  Performance Analysis of Alternative Designs for a Vehicle Disassembly System using Simulation Modeling file Eoksu Sim    2004 
29 IC  AsiaSim  Reorder decision system based on the concept of the order risk using neural networks Sungwon Jung    2004 
28 IC  CIE  Information Strategy Planning for the Korean Postal Address Database file Tai-Woo Chang    2004 
27 IC  e-Biz  Design of Information System for e-Logistics Kitae Shin    2004 
26 IC  IBERC  An Ontology-Based Framework for e-Business Integration file Tai-Woo Chang    2003 
25 IC  ICPR  Combined production and distribution planning using demand based mixed Genetic Algorithm in a supply chain file Sungwon Jung    2003 
24 IC  ICMA  Machine-Understandable e-Business Modeling with Ontology Tai-Woo Chang    2002 
23 IC  Asian eBiz  A Systematic Approach for Ontology-based e-Business Modeling Tai-Woo Chang    2002 
22 IC  SCSC  Performance Improvement Methodology for a Manufacturing System using Petri Nets and Simulation Analysis Kichang Lee    2002 
21 IC  SCSC  Inventory Management in a Supply Chain using Neural Networks file Sungwon Jung    2002 
20 IC  PAIS  Knowledge Acquisition using Neural Network and Simulator Kitae Shin    2001 
19 IC  SeoulSim  Design for a Hybrid System of Integration Kanban with MRPII Taeyoung Song    2001 
18 IC  GECCO  A Study on the Resource Allocation Planning for Automated Container Terminals Yangja Jang    2001 
17 IC  ICPR  Development of a Decision Support System for the formulation of Manufacturing Kichang Lee    2001 
16 IC  ICRA  An On-Line Production Scheduler using Neural Network and Simulator based on Manufacturing System State file Kitae Kim    2001