author Kichang Lee 
2nd author / Kitae Kim (Dept. of Industrial Engineering, Seoul National University)
/ Kitae Shin (Dept. of Industrial Engineering, Seoul National University)
/ Jinwoo Park (Dept. of Industrial Engineering, Seoul National University) 
presenter  
info Date: 1997년 08월 04일 ~ 1997년 08월 05일
City: Osaka
Nation: Japan
Additional Information:
The 14th International Conference on Production Research, pp.1068-1071. 
year 1997 
category IC 
start / end date  
city / nation  
학회 ICPR 
keywords Scheduling, Due Date, Subcontract Cost, Heuristic 
abstract Customer satisfaction is becoming more and more important issue in enterprise environments these days. And meeting due-dates may be one of the most critical necessary conditions in satisfying customer needs. In this respect, many researchers have tried to develop good scheduling algorithms to observe due-dates. Most of these efforts tried to minimize some tardiness related measures by assigning heavy penalty costs when due-dates are violated while considering fixed production capacities. A more practical approach to circumvent the problem may be to use subcontracting mechanism. The production environment of this research may be considered as a flexible flow line. And the objective function of the problem is to minimize the subcontract cost while observing due-date and focusing on the possibilities of subcontracting. The solution methodology adopted in this research is an effective heuristic algorithm based on backward schedule generation and forward search & modification method. The experimental results of this heuristic were shown to be very fast and efficient and in many cases were same with optimal solution.. 

Download:

번호 category 학회 제목 author presenter year
15 IC  PEDAC  A Shifting Bottleneck Procedure for Job-Shop Scheduling minimizing the Sum of Earliness and Tardiness Daeyoung Chung    2001 
14 IC  ICPR  An Algrorithm for Job Shop Scheduling Problem with Due Date Constraints Considering Operation Subcontract Daeyoung Chung    2000 
13 IC  INFORMS-KORMS  Hybrid Algorithms in Integrated Quality Design & Scheduling Jonghan Kim    2000 
12 IC  INFORMS-KORMS  Development of capacitated event-driven MRP components using object oriented method Seunghyun Yoon    2000 
11 IC  APIEMS  An Integrated Approach for Loading and Scheduling of a Flexible Manufactureing System Sangbok Woo    1999 
10 IC  APIEMS  A Study on Developing a Scheduling System in Alternative Routing and Machine Environment Kidong Kim    1999 
9 IC  IW on IMS  Maximally permissive adaptive control of an automated manufacturing cell Sangkyun Kim    1999 
8 IC  ICPR  A Study on FMS Scheduling Problems Based on Priority Functions Generated by Genetic Programming ChangUk Kim    1997 
» IC  ICPR  A Scheduling Algorithm considering Subcontract cost in MRP Environment Kichang Lee    1997 
6 IC  IFAC on IMS  A Weighted Load Balancing Heuristic that Minimizes Makespan in Alternative Routing and Machine Environment Kidong Kim    1997 
5 IC  CIE  A batch splitting heuristic for dynamic job shop scheduling problem Hanil Jeong    1996 
4 IC  CIE  A decision support model for the initial design of FMS Hosub Shin    1996 
3 IC  ICARCV  A Discrete Control Approach to Robotic Cell Operating System Design Jonghun Park    1996 
2 IC  PCM  An Intelligent Batch Splitting method for Schedule Improvement in MRP Environment Hanil Jeong    1996 
1 IC  PCM  FMS Scheduling Strategies in a Distributed Coordination Environment Jonghun Park    1996